Wednesday 01/09 (10:00-12:00)
Lifetime and transverse emittance blow-up studies with 26 GeV coast on the MD segment (SC950)
Capture losses studies with 26 GeV coast on the MD segment (SC950)
Beam conditions: LHC in SPS on SC 950 (up to 2 batches). Nbunch=1.3 x 1011 p (72 bunches). PS basic periods: 9/10/11 and 12/13/14
eH,V* < 3 mm
eL=0.35 eV.s
Participants: G. Arduini, E. B enedetto, T. Bohl, F. Follin, W. Höfle, T. Linnecar, F. Roncarolo, E. Shaposhnikova, J. Tuckmantel, J. Wenninger, AB/OP
Wednesday 01/09 (12:00-13:00)
Lifetime and transverse emittance blow-up studies with 26 GeV coast on the MD segment (SC950)
Capture losses studies with 26 GeV coast on the MD segment (SC950)
Beam conditions: LHC in SPS on SC 950 (up to 2 batches). Nbunch=1.3 x 1011 p (72 bunches). PS basic periods: 9/10/11 and 12/13/14
eH,V* < 3 mm
eL=0.35 eV.s
Reduction of the bunch length with spare 80 MHz cavity in the PS
Participants: G. Arduini, E. B enedetto, T. Bohl, F. Follin, S. Hancock, W. Höfle, T. Linnecar, F. Roncarolo, E. Shaposhnikova, J. Tuckmantel, J. Wenninger, AB/OP
Wednesday 01/09 (13:00-14:00)
Change of supercycle 950 ==> 546
Access in BA5 (D. Smekens, C. Fischer)
Beam conditions: No beam
Participants: AB/OP
Wednesday 01/09 (14:00-17:00)
RF setting-up
Beam conditions: LHC on SC 546 - 1-4 batches
Nbunch = 1.3 x 1011 p
eH,V* < 3 mm
eL=0.35 eV.s
Participants: AB/OP, Ph. Baudrenghien, Th. Bohl
Wednesday 01/09 (17:00-18:00)
Capture loss studies
Beam conditions: LHC in SPS on SC 546 (1-4 batches)
Nbunch=1.3 x 1011 p (72 bunches)
eH,V* < 3 mm
eL=0.35 eV.s
Reduction of the bunch length with spare 80 MHz cavity in the PS
Participants: G. Arduini, E. B enedetto, T. Bohl, F. Follin, S. Hancock, W. Höfle, T. Linnecar, F. Roncarolo, E. Shaposhnikova, J. Tuckmantel, J. Wenninger, AB/OP
Wednesday 01/09 (18:00) - Thursday 02/09 (04:30)
Capture loss studies
Beam conditions: LHC in SPS on SC 546 (1-4 batches)
Nbunch=1.3 x 1011 p (72 bunches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: G. Arduini, E. Benedetto, T. Bohl, F. Follin, W. Höfle, T. Linnecar, F. Roncarolo, E. Shaposhnikova, J. Tuckmantel, J. Wenninger, AB/OP
Wednesday 01/09 (18:00) - Thursday 02/09 (04:30)
Capture loss studies
Beam conditions: LHC in SPS on SC 546 (1-4 batches)
Nbunch=1.3 x 1011 p (72 bunches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: G. Arduini, E. Benedetto, T. Bohl, F. Follin, W. Höfle, T. Linnecar, F. Roncarolo, E. Shaposhnikova, J. Tuckmantel, J. Wenninger, AB/OP
Thursday 02/09 (04:30 - 09:30)
Tail measurement and scraping
Beam conditions: LHC in SPS on SC 546 (1-4 batches)
Nbunch=1.3 x 1011 p (72 bunches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: H. Burkhardt, M. Facchini, C. Fischer, J.J. Gras, Jung, S. Hutchkins, AB/OP
Contact Person: R. Jung
Thursday 02/09 (09:30-10:00)
Change of supercycle 546 ==> 950
Beam conditions: No beam
Participants: AB/OP