Week 41 - SPS Dedicated MD
Monday 04/10 (08:00-09:00)
Change of SC 700 ==> 544 - Access for COLDEX (BA4) and TOTEM (BA5)
Movement of the Collimator without beam
Beam conditions: no beam
Participants: SPS OP team, V. Baglin, O. Aberle, R. Assmann, M. Deile, M. Jonker, S. Redaelli
Monday 04/10 (09:00-16:00)
Setting-up of acceleration to 270 GeV/c and coast at 270 GeV/c for the TOTEM beam
Setting-up of the PLL and Schottky monitors
Setting-up of orbit, LHC BPMs measurements in coast.
Beam conditions: MESPS on SC 544
# injections = 1-6
Nbunch = 1.2 x 1011 p (4 bunches)
eH,V* < 1 mm
eL=0.35 eV.s
Participants: SPS OP team, SPS RF team, G. Arduini, T. Bohl, F. Caspers, M.-E.Castro-Carballo, M. Gasior, S. Jackson, L. Jensen, R. Jones, T. Kroyer, F. Roncarolo, R. Steinhagen, J. Wenninger
Monday 04/10 (16:00-17:00)
Preliminary commissioning of the LHC Beam Loss Monitors
Setting-up of the PLL and Schottky monitors
Movement of the collimator is required
Beam conditions: MESPS on SC 544
# injections = 1-6
Nbunch = 1.2 x 1011 p (4 bunches)
eH,V* < 1 mm
eL=0.35 eV.s
Participants: SPS OP team, O. Aberle, R. Assmann, F. Caspers, M.-E.Castro-Carballo, B. Dehning, M. Gasior,B. Holzer, M. Jonker, T. Kroyer, S. Redaelli, G. Robert-Demolaize, E. Shaposhnikova
Monday 04/10 (17:00-24:00)
Setting-up of acceleration to 270 GeV/c and coast at 270 GeV/c for the LHC beam
Beam conditions: LHC on SC 544
# injections = 1-4
Nbunch = 1.3 x 1011 p (4 bunches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: SPS OP team, SPS RF team, G. Arduini, T. Bohl, F. Roncarolo, J. Wenninger
Tuesday 05/10 (00:00-05:00)
Beam lifetime and emittance blow-up for the nominal LHC beam in coast at 270 GeV/c
Vacuum measurements
Beam conditions: LHC on SC 544
# injections = 1-4
Nbunch = 1.3 x 1011 p
eH,V* < 3 mm
eL=0.35 eV.s
Participants: SPS OP team, SPS RF team, G. Arduini, V. Baglin, E. Benedetto, T. Bohl, F. Roncarolo, A. Rossi, E. Shaposhnikova, F. Zimmermann
Tuesday 05/10 (05:00-07:00)
Test of the orbit feedback in coast
Setting-up of the PLL and Schottky monitors
Movement of the collimator is required
Beam conditions: LHC on SC 544
# injections = 1-4
Nbunch = 1.3 x 1011 p
eH,V* < 3 mm
eL=0.35 eV.s
Participants: SPS OP team, O. Aberle, R. Assmann, F. Caspers, M.-E.Castro-Carballo, M. Gasior, R. Jones, M. Jonker, S. Redaelli, R. Steinhagen, J. Wenninger
Tuesday 05/10 (07:00-08:00)
Change of SC 544 ==> 543 - Access for COLDEX
Beam conditions: no beam
Participants: SPS OP team, V. Baglin
Author: Gianluigi
Arduini - AB/ABP
Last update:
Monday, October 04, 2004 10:08:14 AM
Copyright