Week 43 - SPS Dedicated MD

 

Monday 18/10 (08:00-09:00)

Change of SC 954 ==> 544

Beam conditions: no beam

Access in the SPS for magnet repair + COLDEX

Participants: SPS OP team, V. Baglin

 

Monday 18/10 (09:00-13:00)

Setting-up of acceleration to 270 GeV/c and coast at 270 GeV/c for the LHC beam

Beam conditions: LHC on SC 544

# injections = 1-4

Nbunch = 1.3 x 1011 p (4 batches)

eH,V* < 3 mm

eL=0.35 eV.s

Participants: SPS OP team, SPS RF team, G. Arduini, T. Bohl, F. Roncarolo, J. Wenninger

 

Monday 18/10 (13:00-16:00)

Beam based alignment with high intensity

Test of the orbit feedback in coast

Beam conditions: LHC on SC 544

# injections = 1-4

Nbunch = 1.3 x 1011 p (4 batches)

eH,V* < 3 mm

eL=0.35 eV.s

Participants: SPS OP team, O. Aberle, R. Assmann, F. Decorvet, B. Dehning, B. Holzer, M. Jonker, S. Redaelli, G. Robert-Demolaize, A. Rossi, R. Steinhagen, J. Wenninger

 

Monday 18/10 (16:00-18:00)

Trapped modes and coupled bunch instability measurement

Beam conditions: LHC on SC 544

# injections = 1-4

Nbunch = 1.3 x 1011 p (4 batches)

eH,V* < 3 mm

eL=0.35 eV.s

Participants: SPS OP team, G. Arduini, R. Assmann, T. Bohl, F. Caspers, F. Decorvet, M. Jonker, T. Kroyer, F. Roncarolo, S. Redaelli, E. Shaposhnikova, F. Zimmermann

 

Monday 18/10 (18:00-22:00)

Beam loss maps & halo formation

Beam conditions: LHC on SC 544

# injections = 1-4

Nbunch = 1.3 x 1011 p (4 batches)

eH,V* < 3 mm

eL=0.35 eV.s

Participants: SPS OP team, O. Aberle, R. Assmann, F. Decorvet, B. Dehning, B. Holzer, M. Jonker, S. Redaelli, G. Robert-Demolaize, A. Rossi, R. Steinhagen, J. Wenninger

 

Monday 18/10 (22:00-23:00)

Vacuum and electron cloud measurements with incidence at small angle

Beam conditions: LHC on SC 544

# injections = 1-4

Nbunch = 1.3 x 1011 p (4 batches)

eH,V* < 3 mm

eL=0.35 eV.s

Participants: SPS OP team, O. Aberle, R. Assmann, F. Decorvet, J.-M. Jimenez, A. Rossi

 

Monday 18/10 (23:00) - Tuesday 19/10 (01:00)

Setting-up of acceleration to 270 GeV/c and coast at 270 GeV/c for the TOTEM beam

Beam conditions: MESPS on SC 544

# injections = 1-4

Nbunch = 1.2 x 1011 p (4 bunches)

eH,V* < 1 mm

eL=0.35 eV.s

Participants: SPS OP team, SPS RF team, J. Wenninger, T. Bohl

 

Tuesday 19/10 (01:00-05:00)

Halo formation

Beam conditions: MESPS on SC 544

# injections = 1-4

Nbunch = 1.2 x 1011 p (4 bunches)

eH,V* < 1 mm

eL=0.35 eV.s

Participants: SPS OP team, O. Aberle, R. Assmann, F. Decorvet, B. Dehning, B. Holzer, M. Jonker, S. Redaelli, G. Robert-Demolaize, R. Steinhagen, J. Wenninger

 

Tuesday 19/10 (05:00-08:00)

LHC collimator impedance measurement (head-tail growth rates)

Beam conditions: MESPS on SC 544

# injections = 1-4

Nbunch = 1.2 x 1011 p (4 bunches)

eH,V* < 1 mm

eL=0.35 eV.s

Participants: SPS OP team, G. Arduini, R. Assmann, T. Bohl, F. Caspers, F. Decorvet, M. Gasior, R. Jones, M. Jonker, T. Kroyer, F. Roncarolo, S. Redaelli, E. Shaposhnikova, F. Zimmermann

 


Author: Gianluigi Arduini - AB/ABP
Last update: Friday, January 28, 2005 03:26:03 PM