Week 43 - SPS Dedicated MD
Monday 18/10 (08:00-09:00)
Change of SC 954 ==> 544
Beam conditions: no beam
Access in the SPS for magnet repair + COLDEX
Participants: SPS OP team, V. Baglin
Monday 18/10 (09:00-13:00)
Setting-up of acceleration to 270 GeV/c and coast at 270 GeV/c for the LHC beam
Beam conditions: LHC on SC 544
# injections = 1-4
Nbunch = 1.3 x 1011 p (4 batches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: SPS OP team, SPS RF team, G. Arduini, T. Bohl, F. Roncarolo, J. Wenninger
Monday 18/10 (13:00-16:00)
Beam based alignment with high intensity
Test of the orbit feedback in coast
Beam conditions: LHC on SC 544
# injections = 1-4
Nbunch = 1.3 x 1011 p (4 batches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: SPS OP team, O. Aberle, R. Assmann, F. Decorvet, B. Dehning, B. Holzer, M. Jonker, S. Redaelli, G. Robert-Demolaize, A. Rossi, R. Steinhagen, J. Wenninger
Monday 18/10 (16:00-18:00)
Trapped modes and coupled bunch instability measurement
Beam conditions: LHC on SC 544
# injections = 1-4
Nbunch = 1.3 x 1011 p (4 batches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: SPS OP team, G. Arduini, R. Assmann, T. Bohl, F. Caspers, F. Decorvet, M. Jonker, T. Kroyer, F. Roncarolo, S. Redaelli, E. Shaposhnikova, F. Zimmermann
Monday 18/10 (18:00-22:00)
Beam loss maps & halo formation
Beam conditions: LHC on SC 544
# injections = 1-4
Nbunch = 1.3 x 1011 p (4 batches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: SPS OP team, O. Aberle, R. Assmann, F. Decorvet, B. Dehning, B. Holzer, M. Jonker, S. Redaelli, G. Robert-Demolaize, A. Rossi, R. Steinhagen, J. Wenninger
Monday 18/10 (22:00-23:00)
Vacuum and electron cloud measurements with incidence at small angle
Beam conditions: LHC on SC 544
# injections = 1-4
Nbunch = 1.3 x 1011 p (4 batches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: SPS OP team, O. Aberle, R. Assmann, F. Decorvet, J.-M. Jimenez, A. Rossi
Monday 18/10 (23:00) - Tuesday 19/10 (01:00)
Setting-up of acceleration to 270 GeV/c and coast at 270 GeV/c for the TOTEM beam
Beam conditions: MESPS on SC 544
# injections = 1-4
Nbunch = 1.2 x 1011 p (4 bunches)
eH,V* < 1 mm
eL=0.35 eV.s
Participants: SPS OP team, SPS RF team, J. Wenninger, T. Bohl
Tuesday 19/10 (01:00-05:00)
Halo formation
Beam conditions: MESPS on SC 544
# injections = 1-4
Nbunch = 1.2 x 1011 p (4 bunches)
eH,V* < 1 mm
eL=0.35 eV.s
Participants: SPS OP team, O. Aberle, R. Assmann, F. Decorvet, B. Dehning, B. Holzer, M. Jonker, S. Redaelli, G. Robert-Demolaize, R. Steinhagen, J. Wenninger
Tuesday 19/10 (05:00-08:00)
LHC collimator impedance measurement (head-tail growth rates)
Beam conditions: MESPS on SC 544
# injections = 1-4
Nbunch = 1.2 x 1011 p (4 bunches)
eH,V* < 1 mm
eL=0.35 eV.s
Participants: SPS OP team, G. Arduini, R. Assmann, T. Bohl, F. Caspers, F. Decorvet, M. Gasior, R. Jones, M. Jonker, T. Kroyer, F. Roncarolo, S. Redaelli, E. Shaposhnikova, F. Zimmermann
Author: Gianluigi
Arduini - AB/ABP
Last update:
Friday, January 28, 2005 03:26:03 PM
Copyright
CERN