Monday 15/11 (08:00 - 09:00)
Change of supercycle 950 ==> 546
Coldex IN
Access in SPS (V. Baglin -BA4 , J. Albertone - BA3)
Beam conditions: No beam
Participants: AB/OP
Monday 15/11 (09:00-13:00)
Setting-up of the LHC - 25 ns beam in the SPS
Beam conditions: LHC on SC 546 - 1-4 batches
Nbunch=1.3 x 1011 p (72 bunches)
eH,V* < 3 mm
eL=0.35 eV.s
Participants: G. Arduini, T. Bohl, T. Linnecar, E. Shaposhnikova, J. Tuckmantel, J. Wenninger, AB/OP
Monday 15/11 (13:00-16:00)
Capture loss studies
Beam conditions: LHC in SPS on SC 546 (1-4 batches)
Nbunch=1.3 x 1011 p (72 bunches)
eH,V* < 3 mm
eL=0.35 eV.s
Reduction of the bunch length with spare 80 MHz cavity in the PS
Participants: G. Arduini, T. Bohl, S. Hancock, W. Höfle, T. Linnecar, F. Roncarolo, E. Shaposhnikova, J. Tuckmantel, AB/OP
Monday 15/11 (16:00-19:00)
Setting-up of the LHC - 75 ns beam in the SPS
Beam conditions: MDSPS on SC 546 - 1-4 batches
Nbunch=1.3 x 1011 p (24 bunches)
eH,V* ~ 1 mm
eL=0.35 eV.s
Participants: G. Arduini, T. Bohl, S. Hancock, W. Höfle, T. Linnecar, F. Roncarolo, E. Shaposhnikova, J. Tuckmantel, J. Wenninger, AB/OP
Monday 15/11 (19:00) - Tuesday 16/11 (03:00)
Longitudinal and Transverse measurements
Beam conditions: MDSPS on SC 546 - 1-4 batches
Nbunch=1.3 x 1011 p (24 bunches)
eH,V* ~ 1 mm
eL=0.35 eV.s
Participants: G. Arduini, T. Bohl, S. Hancock, W. Höfle, T. Linnecar, F. Roncarolo, E. Shaposhnikova, J. Tuckmantel, AB/OP
Tuesday 16/11 (03:00-04:00)
Continuous emittance measurement
Beam conditions: MDSPS on SC 546 - 1-4 batches
Nbunch=1.3 x 1011 p (24 bunches)
eH,V* ~ 1 mm
eL=0.35 eV.s
Participants: AB/OP, C. Fischer, J. Koopman, F. Roncarolo
Tuesday 16/11 (04:00-08:00)
Scraping tests
Beam conditions: MDSPS on SC 546 - 1-4 batches
Nbunch=1.3 x 1011 p (24 bunches)
eH,V* ~ 1 mm
eL=0.35 eV.s
Participants: AB/OP, H. Burkhardt, C. Fischer, J.J. Gras, S. Hutchkins, R. Jung, J. Koopman