Monday 26/07 (08:00 - 18:00) - PS parallel MD
Matching Linac 2 - Booster
Beam conditions: XXXX in PSB
Participants: K. Hanke, J. Sanchez
Contact Person: K. Hanke
Monday 26/07 (08:00 - 18:00) - SPS parallel MD
PLL in the SPS
Beam conditions: LHC on SC 950 (basic periods 9-10-11 in the PS super-cycle)
Nbunch = 1.3 x 1011 p - 72 bunches
eH,V* < 3 mm
eL=0.35 eV.s
Participants: A. Burns, M.-E. Castro-Carballo, M. Gasior, W. Höfle, R. Jones, P. Cameron (BNL)
Contact Person: R. Jones
Tuesday 27/07 (08:00 - 18:00) - PS parallel MD
Coupled-bunch feedback commissioning for the LHC beam
Beam conditions: LHC in PS
Nbunch = 1.3 x 1011 p - 72 bunches
eH,V* < 3 mm
eL=0.35 eV.s
Participants: R. Garloby, S. Hancock, J.-L. Vallet
Contact Person: S. Hancock
Wednesday 28/07 (08:00-16:00) - PS parallel MD
Coupled-bunch feedback commissioning for the LHC beam
Beam conditions: LHC in PS
Nbunch = 1.3 x 1011 p - 72 bunches
eH,V* < 3 mm
eL=0.35 eV.s
Participants: R. Garloby, S. Hancock, J.-L. Vallet
Contact Person: S. Hancock
Adiabatic capture of particle in stable islands of transverse phase space
Beam conditions: MD2 in PS
Participants: R. Cappi, M. Giovannozzi, M. Martini, E. Métral, R. Steerenberg.
Contact Person: M. Giovannozzi
CNGS Beam Position Monitor Test PSB parallel MD
Beam conditions: Intensity: ~6.3×1012 p/bunch (4 bunches) Bunch length: ~230ns. Bunch spacing: 572 ns
Participants: T. Bogey, R. Jones
Contact Person: R. Jones.
Thursday 29/07 (08:00 - 18:00) - SPS parallel MD
BBLR
Beam conditions: TSTLHC in SPS on SC 950. Nbunch=1.3 x 1011 p (12 bunches - PSB ring 3). PS basic periods: 10/11.
eH,V* < 3 mm
eL=0.35 eV.s
Participants: J. P. Koutchouk, J. Wenninger, F. Zimmermann
Contact Person: F. Zimmermann
Friday 30/07 (08:00 - 18:00) - PS parallel MD
Adiabatic capture of particle in stable islands of transverse phase space
Beam conditions: MD2 in PS
Participants: R. Cappi, M. Giovannozzi, M. Martini, E. Métral, R. Steerenberg.
Contact Person: M. Giovannozzi
Thursday 29/07 - Sunday 01/08 - PS parallel MD during afternoon shift
High Intensity Fixed Target Beam in preparation for CNGS test
Beam conditions: MDPRO(?) in PS
Ntotal > 3 × 1013 p, minimum transverse emittance
Participants: B. Vandorpe
Contact Person: B. Vandorpe
Author: Gianluigi
Arduini - AB/ABP
Last update:
Thursday, July 22, 2004 01:05:24 PM
Copyright
CERN