Monday 09/08 (08:00 - 18:00) - SPS parallel MD
Setting-up of the TOTEM beam in the SPS
Beam conditions: MESPS in SPS
Nbunch = 0.4 x 1011 p
eH,V* < 1 mm
eL=0.35 eV.s
Participants: AB/OP, AB/ RF, G. Arduini
Contact Person: G. Arduini
Tuesday 10/08 (08:00 - 18:00) - SPS parallel MD
Setting-up of the TOTEM beam in the SPS
Beam conditions: MESPS in SPS
Nbunch = 0.4 x 1011 p
eH,V* < 1 mm
eL=0.35 eV.s
Participants: AB/OP, AB/ RF, G. Arduini
Contact Person: G. Arduini
Wednesday 11/08 (08:00 - 18:00) - PS parallel MD
Optimization of the 75 ns beam
Beam conditions: MDRF in PS
Nbunch = 1.3 x 1011 p - 16 bunches
eH,V* < 3 mm
eL=0.35 eV.s
Participants: R. Garoby, S. Hancock, J.-L. Vallet
Contact Person: S. Hancock
Wednesday 11/08 (10:00) - Thursday 12/08 (10:00)
Thursday 12/08 (10:00-18:00) - SPS parallel MD
Stabilization by coupling
Beam conditions: LHC on SC 950 (basic periods 9- 10- 11 in the PS super-cycle)
Nbunch = 1.3 x 1011 p - 72 bunches
eH,V* < 3 mm
eL=0.35 eV.s
Participants: G. Arduini, W. Höfle, E. Métral
Contact Person: G. Arduini
Friday 13/08 (08:00 - 18:00) - PS parallel MD
Optimization of the 75 ns beam
Beam conditions: MDRF in PS
Nbunch = 1.3 x 1011 p - 16 bunches
eH,V* < 3 mm
eL=0.35 eV.s
Participants: R. Garoby, S. Hancock, J.-L. Vallet
Contact Person: S. Hancock
Wednesday 11/08 - Thursday 12/08 - PS parallel MD during night shift
High Intensity Fixed Target Beam in preparation for CNGS test
Beam conditions: MDPRO(?) in PS
Ntotal > 3 × 1013 p, minimum transverse emittance
Participants: B. Vandorpe
Contact Person: B. Vandorpe