Week 33 - Parallel MD

 

Monday 09/08 (08:00 - 18:00) - SPS parallel MD

Setting-up of the TOTEM beam in the SPS

Beam conditions: MESPS in SPS

Nbunch = 0.4 x 1011 p

eH,V* < 1 mm

eL=0.35 eV.s

Participants: AB/OP, AB/ RF, G. Arduini

Contact Person: G. Arduini

 

Tuesday 10/08 (08:00 - 18:00) - SPS parallel MD

Setting-up of the TOTEM beam in the SPS

Beam conditions: MESPS in SPS

Nbunch = 0.4 x 1011 p

eH,V* < 1 mm

eL=0.35 eV.s

Participants: AB/OP, AB/ RF, G. Arduini

Contact Person: G. Arduini

 

Wednesday 11/08 (08:00 - 18:00) - PS parallel MD

Optimization of the 75 ns beam

Beam conditions: MDRF in PS

Nbunch = 1.3  x 1011 p - 16 bunches

eH,V* < 3 mm

eL=0.35 eV.s

Participants: R. Garoby, S. Hancock, J.-L. Vallet

Contact Person: S. Hancock

 

Wednesday 11/08 (10:00) - Thursday 12/08 (10:00)

SPS Dedicated MD

 

Thursday 12/08 (10:00-18:00) - SPS parallel MD

Stabilization by coupling

Beam conditions: LHC on SC 950 (basic periods 9- 10- 11 in the PS super-cycle)

Nbunch = 1.3  x 1011 p - 72 bunches

eH,V* < 3 mm

eL=0.35 eV.s

Participants: G. Arduini, W. Höfle, E. Métral

Contact Person: G. Arduini

 

Friday 13/08 (08:00 - 18:00) - PS parallel MD

Optimization of the 75 ns beam

Beam conditions: MDRF in PS

Nbunch = 1.3  x 1011 p - 16 bunches

eH,V* < 3 mm

eL=0.35 eV.s

Participants: R. Garoby, S. Hancock, J.-L. Vallet

Contact Person: S. Hancock

 

Wednesday 11/08 - Thursday 12/08 - PS parallel MD during night shift

High Intensity Fixed Target Beam in preparation for CNGS test

Beam conditions: MDPRO(?) in PS

Ntotal >  3 × 1013 p, minimum transverse emittance

Participants: B. Vandorpe

Contact Person: B. Vandorpe

 


Author: Gianluigi Arduini - AB/ABP