Monday 16/08 (08:00 - 18:00) - SPS parallel MD
Setting-up of the nominal LHC beam in the SPS
Beam conditions: LHC on SC 950 (basic periods 9-10-11 in the PS super-cycle)
Nbunch = 1.3 x 1011 p - 72 bunches
eH,V* < 3 mm
eL=0.35 eV.s
Participants: AB/OP, AB/RF
Contact Person: G. Arduini
Tuesday 17/08 (08:00 - 18:00) - SPS parallel MD
Setting-up of the nominal LHC beam in the SPS
Beam conditions: LHC on SC 950 (basic periods 9-10-11 in the PS super-cycle)
Nbunch = 1.3 x 1011 p - 72 bunches
eH,V* < 3 mm
eL=0.35 eV.s
Participants: AB/OP, AB/RF
Contact Person: G. Arduini
Wednesday 18/08 (08:00 - 16:00)
Wednesday 18/08 (16:00) - Thursday 19/08 (08:00)
Thursday 19/08 (08:00-18:00) - PS parallel MD
Adiabatic capture of particle in stable islands of transverse phase space
Beam conditions: MD2 in PS
Participants: M. Giovannozzi, M. Martini, E. Métral, R. Steerenberg.
Contact Person: M. Giovannozzi
Friday 20/08 (08:00 - 18:00) - SPS parallel MD
Calibration of the wire scanners
Beam conditions: MESPS in SPS
Nbunch = 0.4 x 1011 p
eH,V* < 1 mm
eL=0.35 eV.s
Participants: AB/OP, F. Roncarolo
Contact Person: F. Roncarolo
Monday 16/08 - Tuesday 17/08 - PS parallel MD during afternoon shift
Friday 20/08 - Sunday 22/08 - PS parallel MD during morning shift
High Intensity Fixed Target Beam in preparation for CNGS test
Beam conditions: MDPRO(?) in PS
Ntotal > 3 × 1013 p, minimum transverse emittance
Participants: B. Vandorpe
Contact Person: B. Vandorpe
Author: Gianluigi
Arduini - AB/ABP
Last update:
Wednesday, August 18, 2004 02:20:23 PM
Copyright
CERN