Regular meetings will be held in the PCR Conference room (874-1-007) every morning at 09:00 during the scrubbing run.
The aim of the meeting is to review the machine performance and experiments of the previous day and define the programme of the day.
Wednesday 09/06 (08:00 - 18:00)
Setting-up of Injection and Capture of the 75 ns LHC beam
COLDEX IN (access form 08:00 to 09:00 during SC change)
Beam conditions: MDSPS in SPS on SC 604 (43.2 s long)
#batches = 1 - 4
Ibunch = close to 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Wednesday 09/06 (18:00) - Thursday 10/06 (08:00)
Scrubbing run
Beam conditions: MDSPS in SPS on SC 604 (43.2 s long)
#batches = 4
Ibunch = close to 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Thursday 10/06 (08:00 - 14:00)
Scrubbing run - intensity and bunch length scans
Beam conditions: MDSPS in SPS on SC 604 (43.2 s long)
#batches = 1-4
Ibunch = 0.3 - 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Thursday 10/06 (14:00-22:00)
Setting-up of Injection and Capture of the 25 ns LHC beam
Beam conditions: LHC in SPS on SC 604 (43.2 s long)
#batches = 1-4 (the number of batches will be maximized compatibly with the MKE heating, keeping the maximum duty factor)
Ibunch = 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Thursday 10/06 (22:00) - Monday 14/06 (08:00)
Scrubbing run
Beam conditions: LHC in SPS on SC 604 (43.2 s long)
#batches = 1-4 (the number of batches will be maximized compatibly with the MKE heating, keeping the maximum duty factor)
Ibunch = 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Monday 14/06 (08:00)
End of the first part of the scrubbing run.
COLDEX OUT (access from 08:00 to 09:00 during change of SC)
Monday 21/06 (08:00-10:00)
Setting-up of Injection and Capture of the 25 ns LHC beam
COLDEX IN (access from 08:00 to 09:00)
Beam conditions: LHC in SPS on SC 604 (43.2 s long)
#batches = 1-4 (the number of batches will be maximized compatibly with the MKE heating, keeping the maximum duty factor)
Ibunch = 0.4 - 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Monday 21/06 (10:00 - 16:00)
Scrubbing run - Intensity scan
Beam conditions: LHC in SPS on SC 604 (43.2 s long)
#batches = 1-4 (the number of batches will be maximized compatibly with the MKE heating, keeping the maximum duty factor)
Ibunch = 0.4 - 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Monday 21/06 (16:00) - Wednesday 23/06 (08:00)
Scrubbing run
Beam conditions: LHC in SPS on SC 604 (43.2 s long)
#batches = 1-4 (the number of batches will be maximized compatibly with the MKE heating, keeping the maximum duty factor)
Ibunch = 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Wednesday 23/06 (08:00-16:00)
PS Technical stop - No beam
Wednesday 23/06 (16:00) - Saturday 26/06 (08:00)
Scrubbing run
Beam conditions: LHC in SPS on SC 604 (43.2 s long)
#batches = 1-4 (the number of batches will be maximized compatibly with the MKE heating, keeping the maximum duty factor)
Ibunch = 1.3 x 1011 p/bunch
Minimum transverse emittance (in any case e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s.
Saturday 26/06 (08:00)
End of the scrubbing run.
COLDEX OUT (access from 08:00 to 09:00 during change of SC)
Author: Gianluigi
Arduini - AB/ABP
Last update: Tuesday, June 15, 2004 09:26:30 AM