Wednesday 04/08 (08:00 - 16:00)
Setting-up of the 26 GeV coast on the MD segment (SC950)
Beam conditions: TSTLHC in SPS on SC 950 (up to 2 batches). Nbunch=1.3 x 1011 p (12 bunches - PSB ring 3). PS basic periods: 10/11 and 13/14
LHC in SPS on SC 950 (up to 2 batches). Nbunch=1.3 x 1011 p (72 bunches). PS basic periods: 9/10/11 and 12/13/14
eH,V* < 3 mm
eL=0.35 eV.s
Participants: T. Bohl, W. Höfle, M. Jonker, F. Follin, F. Roncarolo, J. Wenninger, AB/OP
Author: Gianluigi
Arduini - AB/ABP