Wednesday 04/07 (08:00-10:00)
During the scrubbing run and the LONG MDs with LHC beam the ZS are RETRACTED / HV to 0 kV / ION TRAPS ON (inform the ZS expert). The cooling circuit for the septa magnets (circuits 214, 414 and 614) should be switched OFF (by TI). Block the fast vacuum valves OUT in the injection and extraction areas (LSS1,LSS2,LSS6)
Change of supercycle (LHC-FT500_PDOT_V1 - User=LHC25) and HW compensation trim
Beam conditions: No beam
Participants: AB/OP - AB/RF - AB/ABP
Wednesday 04/07 (10:00-14:00)
Setting-up of the cycle with LHC beam (12 bunches)
SPS user: LHC25 - PS USER=LHC25
#batches = 1 (12 bunches) - Extraction w/o QKE58 from PS
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Participants: AB/OP - AB/RF - AB/ABP - AB/BI
Wednesday 04/07 (14:00-20:00)
Setting-up of 800 MHz, RF feedback and feedforward and longitudinal damper
Transverse fine tuning in parallel
SPS user: LHC25 - PS USER=LHC25
#batches = 1-4 (72 bunches) - Extraction w/o QKE58 from PS
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Participants: AB/OP - AB/RF - AB/ABP - AB/BI
Wednesday 04/07 (20:00-21:00)
Transverse damper set-up
SPS user: LHC25 - PS USER=LHC25
#batches = 1-4 (72 bunches) - Extraction w/o QKE58
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Participants: AB/OP - AB/RF - AB/ABP
Wednesday 04/07 (21:00-22:00)
Setting-up of the cycle with Pilot beam
SPS user: LHC25 - RF MMI pointing to LHC PILOT - PS USER=LHCPILOT
#injections = 1 (1 bunch) - Extraction w/o QKE58
Nb = 5 x 109 p/b
Transverse emittances (e* = 3 mm)
Longitudinal emittance: eL* = 0.3 eV.s
Participants: AB/OP - AB/RF - AB/ABP - AB/BI
Wednesday 04/07 (22:00)- Thursday 05/07 (04:00)
Non-linear chromaticity measurements all along the cycle
SPS user: LHC25 - RF MMI pointing to LHC PILOT - PS USER=LHCPILOT
#injections = 1 (1 bunch) - Extraction w/o QKE58
Nb = 5 x 109 p/b
Transverse emittances (e* = 3 mm)
Longitudinal emittance: eL* = 0.3 eV.s
Participants: AB/OP - AB/ABP - AB/BI
Contact person: R. Tomas
Thursday 05/07 (04:00-06:00)
Creation of references for the Pilot beam
SPS user: LHC25 - RF MMI pointing to LHC PILOT - PS USER=LHCPILOT
#injections = 1 (1 bunch) - Extraction w/o QKE58
Nb = 5 x 109 p/b
Transverse emittances (e* = 3 mm)
Longitudinal emittance: eL* = 0.3 eV.s
Participants: AB/OP
Thursday 05/07 (04:00-06:00)
Creation of references for the LHC nominal beam
SPS user: LHC25 - RF MMI pointing to LHC25 - PS USER=LHC25
#batches = 1-4 (72 bunches) - Extraction w/o QKE58
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Participants: AB/OP
Thursday 05/07 (08:00)
End of MD
Unblock the vacuum valves in the injection and extraction areas
Ask TI to restart the cooling circuit for the septa magnets (circuits 214, 414 and 614)
Inform the ZS expert to check the conditioning of the septa before set the HV
Author: Gianluigi
Arduini - AB/ABP
Last update:
Tuesday, July 03, 2007 12:04:14 PM
Copyright
CERN