Tuesday 25/09 (08:00 - 15:00) - Setting-up of the nominal (4 times 72 bunches) 25 ns LHC beam in the SPS (both transverse and longitudinal)
Change of supercycle => LHCMD25.92-55-270_PDOT_V2 (31.2 s long)
Timing sequence Name => LHC25NS-w/coast-0/1/3
Other equipment modifications for the MD:
- Changed accelerator mode for FT: no extraction
- NORTH extraction off
- MST/MSE girders retracted
- Servo off
- Switched off TT20 AUXPS
Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS => See below how to do this)
RF MMI pointing to LHC25NS (method):
- Working Sets
- RF-MMI => SPS-MMI
- Select context => SPS.USER.LHC25NS
- View => Show devices description
- MMI target LHC25NS => Enabled and MMI target "previous one" => Disabled. To be done 2 times as it appears 2 times in the list
- Delay has to be set to 550
#injections = 1 with 12 bunches first up to 4 with 72 bunches - Extraction from the PS w/o QKE58
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
=> Check also that the timing SIX.MC-CTM is Enabled (CCV 425) in Timing New (it allows the instrumentation to work)
- RF MMI / RF synchro / LHC25NS / Write / BU bunch 3847 (this value might change! => To be set-up) for the 1st injection => Put this value + 400 for the 2nd, + 2*400 for the 3rd and + 3*400 for the 4th one.
Participants: OP, RF, ABP, BI
Tuesday 25/09 (15:00 - 20:00) - Study of the effect of energy (and transverse beam emittances) on the electron cloud vertical fast instability at 55 GeV/c
Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS)
#injections = 1-4 (72 bunches) - Extraction from the PS w/o QKE58
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Contact person: G. Rumolo
Tuesday 25/09 (20:00 - 21:00) - Access to install two new signal cables on CH1 (SEM) and CH2 (IC after collimator) (Bend Dehning and others)
Tuesday 25/09 (21:00) – Wednesday 26/09 (01:00) – Scrapers (at 270 GeV/c)
#injections = 1 (72 bunches) - Extraction from the PS w/o QKE58
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Coast at 270 GeV/c
Contact person: H. Burkhardt
Wednesday 26/09 (01:00 – 04:00) – Study for the LHC BLMs
Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS)
#injections = 1 (12 bunches) - Extraction from the PS w/o QKE58
Nb = 1.3 x 1011 p/b (can be varied)
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.3 eV.s
Coast at 270 GeV/c
Contact person: B. Holzer
Wednesday 26/09 (04:00 - 06:00) – SPS-LHC re-phasing on the flat-top at 270 GeV/c
Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS)
#injections = 1-4 (12 and/or 72 bunches) - Extraction from the PS w/o QKE58
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Contact person: P. Baudrenghien
Wednesday 26/09 (06:00 - 08:00) - On-line modeling in the SPS with MADX in view of LHC
Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS)
#injections = 1 (12 bunches) - Extraction from the PS w/o QKE58
Nb = 1.3 x 1011 p/b (can be varied)
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.3 eV.s
Coast at 270 GeV/c
Contact person: I. Agapov
Author: Elias Métral - AB/ABP