Monday 25/06 (08:00 - 18:00) - Setting-up of the RF feedback and feedforward with LHC beam in the SPS
Beam conditions: LHC25ns in SPS on Cycle SFT-LHCMD37_L16800_PDOT_V1 (16.8 s long)
#batches = 1 (72 bunches) - LHC25ns in position 9-10-11 in the PS SC - Extraction w/o QKE58
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Participants: OP, RF
Contact person: T. Bohl
Tuesday 26/06 (08:00 - 18:00) - 800 MHz phasing + Study of the effect of energy (and transverse beam emittances) on the electron cloud vertical fast instability
Beam conditions: LHC25ns in SPS on Cycle SFT-LHCMD37_L16800_PDOT_V1 (16.8 s long)
#batches = 1 (72 bunches) - LHC25ns in position 9-10-11 in the PS SC - Extraction w/o QKE58
Nb = 1.3 x 1011 p/b
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Participants: ABP, OP, RF
Contact person: T. Bohl, G. Rumolo
Thursday 28/06 (08:00 - 18:00) - Study of the effect of energy (and transverse beam emittances) on the electron cloud vertical fast instability
Beam conditions: LHC in SPS on Cycle SFT-LHCMD37_L16800_PDOT_V1 (16.8 s long)
#batches = 1 (72 bunches) - LHC25ns in position 9-10-11 in the PS SC - Extraction w/o QKE58
Nb = 1.3 x 1011 p/b (i.e. nominal intensity)
Transverse emittances (e* < 3 mm)
Longitudinal emittance: eL* = 0.35 eV.s
Participants:ABP, OP, RF
Contact person: G. Rumolo
Friday 29/06 (08:00 - 18:00) - PS Setting-up for MTE studies
Beam conditions: MD2 in PS, MD1 in PSB
Participants:ABP, OP
Contact person: S. Gilardoni
Author: Elias Métral - AB/ABP
Last update:
Friday, June 22, 2007 04:36:34 PM
Copyright
CERN