Week 28 - Parallel MD
Reminder 1: There should always be 1 cycle reserved for parallel studies in the PSB.
Reminder 2: During the week (if / when possible) the PSB (and then the PS) will work on the production of LHC75/LHC50 in 1 batch.
Monday 06/07 (08:00 - 18:00) -
Setting-up of the beam to be used for BBLR in the SPS + BBLRs HW testsBeam conditions
: SPS cycle = MD_55_106_2009_V1 (plateau of 5 s at 55 GeV/c), PS user = LHCINDIV and PSB user = LHCINDIVSPS user Timing = LHC3 and RF MMI mapping = LHCMONO
#bunches = 4 (i.e. 4 PSB rings)
Nb = 1E11 p/bTransverse emittances:
e* = 3 micromLongitudinal emittance:
eL* = 0.35 eVs(Qx, Qy) = (26.31, 26.28)
Contact Person: OP, RF and ABP
Tuesday 07/07 (08:00 - 18:00) -
BBLR (compensation with half wires) in the SPSBeam conditions
: SPS cycle = MD_55_106_2009_V1 (plateau of 5 s at 55 GeV/c), PS user = LHCINDIV and PSB user = LHCINDIVSPS user Timing = LHC3 and RF MMI mapping = LHCMONO
#bunches = 4 (i.e. 4 PSB rings)
Nb = 1E11 p/bTransverse emittances: e* = 3 microm
Longitudinal emittance: eL* = 0.35 eVs
(Qx, Qy) = (26.31, 26.28)
Contact Person: G. Sterbini
Wednesday 08/07 (08:00 - 18:00) -
BBLR (excitation with half wires) in the SPSBeam conditions
: SPS cycle = MD_55_106_2009_V1 (plateau of 5 s at 55 GeV/c), PS user = LHCINDIV and PSB user = LHCINDIVSPS user Timing = LHC3 and RF MMI mapping = LHCMONO
#bunches = 4 (i.e. 4 PSB rings)
Nb = 1E11 p/bTransverse emittances: e* = 3 microm
Longitudinal emittance: eL* = 0.35 eVs
(Qx, Qy) = (26.31, 26.28)
Contact Person: G. Sterbini
Thursday 09/07 (08:00 - 18:00) -
BBLR (excitation with half wires) in the SPS + recabling at the end (between 17:00 and 18:00)Beam conditions
: SPS cycle = MD_55_106_2009_V1 (plateau of 5 s at 55 GeV/c), PS user = LHCINDIV and PSB user = LHCINDIVSPS user Timing = LHC3 and RF MMI mapping = LHCMONO
#bunches = 4 (i.e. 4 PSB rings)
Nb = 1E11 p/bTransverse emittances: e* = 3 microm
Longitudinal emittance: eL* = 0.35 eVs
(Qx, Qy) = (26.31, 26.28)
Contact Person: G. Sterbini
Friday 10/07 (08:00 - 18:00) -
Check LHC beams which will be required for the TI2 tests of the week-end (on LHCFAST) + some tests on the BQM with 12 bunches by G. PapottiContact Person: OP