Week 42 - Parallel MD
Reminder 1: There should always be 1 cycle reserved for parallel studies in the PSB and PS.
Reminder 2: During the whole week, desorption studies on cryogenic targets will take place in the LINAC3 (E. Mahner).
Reminder 3: Start a detailed campaign of measurements of transverse beam profiles in the SPS with all the BWS available (416, 519, 521 and 414V).
Monday 12/10 (14:00) to Tuesday 13/10 (12:00) - Beam for LHCb tests
Beam conditions: SPS cycle = LHCFAST2, PS user = LHCPROBE (or TSTLHC25) and PSB user = LHCPROBE (or LHC25A)
- LHCPROBE => Nb = 2E9 p/b (can be increased up to 5E9 p/b by a simple timing in the PS)
- LHC25A => Only 1 ring in the PSB as only 12 bunches will be needed in the SPS, and at ~ 1/10 of the nominal intensity, as ~ 1E10 p/b will be needed in the SPS
Contact Person: R. Giachino and J. Wenninger
Thursday 15/10 and Friday 16/10 (08:00 - 18:00)
Preparation in the SPS for the sector test at the end of
week 43
Beam conditions:
SPS cycle =
LHCFAST2, PS user = LHCPROBE and PSB user = LHCPROBE
Contact Person: V.
Kain
Instability studies at PS transition Beam conditions
Contact Person: S. Aumon