Week 46 - Parallel MD
Reminder 1: There should always be 1 cycle reserved for parallel studies in the PSB and PS.
Reminder 2: Continue the detailed campaign of measurements of transverse beam profiles in the SPS with all the BWS available (416, 519, 521 and 414V).
Monday 09/11 (08:00 - 18:00) -
Coupled-bunch feedback with C11 in the PSBeam conditions: PS user = LHC25 and PSB user = LHC25A&B
Contact Person: H. Damerau