Week 47 (16Nov09) - Parallel MD
Reminder 1: There should always be 1 cycle reserved for parallel studies in the PSB and PS.
Reminder 2: Continue the detailed campaign of measurements of transverse beam profiles in the SPS with all the BWS available (416, 519, 521 and 414V).
Monday 16/11 (08:30 - 17:30) - Complete the validation of YASP on high-energy correction in the PS with beam
Beam conditions: PS user = 2 BP LHC-type cycle such as TSTPS
Contact Person: M. Gourber-Pace
Tuesday 17/11 (14:00 - 16:30) - Complete the validation of YASP on high-energy correction in the PS with beam
Beam conditions: PS user = 2 BP LHC-type cycle such as TSTPS
Contact Person: M. Gourber-Pace
Wednesday 18/11 (08:00 - 18:00) - Low-intensity variants of the single-batch LHC50ns in the PS
Beam conditions: PS user = LHC75 (2 BP) and PSB user = LHC75A
Contact Person: H. Damerau
Author: Elias Métral - AB/ABP