Week 27 - Parallel MD (Starting on Monday 05/07/2010 and ending on Friday 09/07/2010)
Monday 05/07 (08:00 - 13:00) - LHCINDIV maximum intensity studies in the PSB (to be ready for SPS studies during the week) => Within about nominal longitudinal and transverse beam parameters
Contact Person: G. Rumolo and B. Mikulec
Monday 05/07 (13:00 - 18:00) - LHCINDIV maximum intensity studies in the PS (to be ready for SPS studies during the week) => Within about nominal longitudinal and transverse beam parameters
Contact Person: H. Damerau and R. Steerenberg
Tuesday 06/07 (08:00) to Friday 09/07 (18:00) - LHCINDIV maximum intensity studies in the PS: evolution of the transverse properties as a function of intensity
Contact Person: R. Steerenberg
Thursday 08/07 (08:00 - 16:00) - LHC multi-injection test in the SPS => 4 injections into the SPS of 1 single LHCINDIV bunch from the PS on the cycle LHC_4Inj_FB7260_FT500_2010_V1.csv. Longitudinal emittance blow up to be checked for this beam
Conditions:
- No other users in //
- The LHC should be in fill from Wednesday 20:00 until Thursday 12:00 (discussion with Malika, 06/07/2010)
- LHC filling possible after 14:00 => Additional LHCFAST cycle to be added
Contact Persons: T. Bohl, B. Goddard, G. Papotti
Author: Elias Métral - AB/ABP
Last update:
Tuesday, July 06, 2010 12:22:52 PM
Copyright
CERN