Week 33 -
Floating SPS MD
Wednesday 17/8/2011 in parallel with LHC
operation (24h)
Wednesday 08h00 - 20h00
Supercycle:
total 36bp, made of
two long flat
bottom LHC cycles, one nominal optics and the other one low gamma transition
MD title:
High intensity & electron cloud measurements with 50ns
beams on Q20 and Q26 cycles
Beam conditions:
50ns beam with double batch PSB-PS transfer (up to 3 batches, 1.6e11 ppb)
Cycle:
LHCMD_50ns_D_2011_V1
(18bp),
LHCMD_50ns_D_Q20_2011_V1
(18bp)
PSB user = LHC_A + LHC_B, LHC_SU_A + MD4
PS cycle = LHC_DB_50
PS timing user = LHC_MD
SPS user = LHCFAST3, LHCMD1
RF MMI target = MD1, LHCMD1
Contact People: H. Bartosik, Y. Papaphilippou, B.
Salvant, SPSU-BD team, BE/OP
Additional remarks:
Wednesday 20h00 - Thursday 07h00
Supercycle: fully dedicated MD
MD title:
High-bandwidth feedback studies
Beam conditions:
Single bunch, nominal intensity 1.2e11 on a cycle with long flat bottom
Cycle:
LHCMD_50ns_D_2011_V1
(18bp)
PSB cycle = LHCINDIV
PSB timing user = LHCINDIV
PS cycle = LHCINDIV
PS timing user = LHCINDIV
SPS user = LHCMD1
RF MMI target = MD1
Contact People: W. Höfle, SLAC visitors, BE/OP, BE/RF
Thursday 07h00 - Thursday 08h00
Recovery from MD and switch back to physics