Week 27 -
Long dedicated SPS MD
Monday-Friday 04-08/07/2011 during LHC
stop
Monday 08h00 - 12h00
Supercycle:
special supercycle
composed of Booster LHC_MD_A users separated by one or two zero cycles. No other
destination than the PSB dump.
MD title: High intensity tests from
Linac2
Beam conditions:
Check the effect on LHC-type beams
Cycle:
PSB user = LHC_MD_A
PS cycle =
PS timing user =
SPS user =
RF MMI target =
Contact People: R. Scrivens, B. Mikulec, G. Rumolo
Additional remarks: Emittance vs. intensity curves (changing the number of injected turns) should be determined for high current injected from the Linac2 and compared to previously measured curves with nominal intensity from Linac2. During this measurements the PS MPS must not be pulsed in order not to have perturbation from the PS stray field.
Monday 14:00 - 18:00
Supercycle:
total 36bp, made of
two long flat bottom LHC
cycles, one nominal optics and the other one low gamma transition
MD title: BLM tests in the dump line
Beam conditions:
low intensity beam (between 1e9 and 1e10 p)
Cycle:
PSB user = copy of LHCPROBE to an MD user
PS cycle =
PS timing user =
SPS user =
RF MMI target =
Contact People: Eduardo Nebot Del Busto, Bernd
Dehning
Additional remarks: This MD will be carried out in parallel with the SPS users (see next) and PS (and PSB? compatibility to be checked) physics users. During these tests it has be made sure that only this beam goes to the beam dump, therefore the other users must have either PS (or ISOLDE?) as destination and have zero cycles in spare.
Monday 12h00 - 15h00
Supercycle:
total 36bp, made of
two long flat
bottom LHC cycles, one nominal optics and the other one low gamma transition
MD title: Set up of beam in the transverse
plane (1 batch only)
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_Q20_2011_V1
(18bp)
PSB user = LHC_SU_A + LHC_SU_B
PS cycle = LHC_DB_50
PS timing user = ?
SPS user = LHCFAST3
RF MMI target = LHCMD3
Contact People: H. Bartosik, Y. Papaphilippou,
B. Salvant, BE/OP
Additional remarks:
MD title: RF
setting (1 batch only)
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_2011_V1
(18bp)
PSB user = LHC_MD_A + LHC_MD_B
PS cycle = LHC_DB_50
PS timing user = LHC_MD
SPS user = LHCMD1
RF MMI target = LHCMD1
Contact People: T. Bohl, BE/OP
Additional remarks:
Monday 15h00 - 18h00
Supercycle:
total 36bp, made of
two long flat
bottom LHC cycles, one nominal optics and the other one low gamma transition
MD title: RF setting (1 batch only)
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_Q20_2011_V1
(18bp)
PSB user = LHC_SU_A + LHC_SU_B
PS cycle = LHC_DB_50
PS timing user = ?
SPS user = LHCFAST3
RF MMI target = LHCMD3
Contact People: T. Bohl, BE/OP
Additional remarks:
MD title:
Transverse damper set up (1 batch only)
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_2011_V1
(18bp)
PSB user = LHC_MD_A + LHC_MD_B
PS cycle = LHC_DB_50
PS timing user = LHC_MD
SPS user = LHCMD1
RF MMI target = LHCMD1
Contact People: W. Höfle, D.
Valuch, BE/OP
Additional remarks:
Monday 18h00 - 21h00
Supercycle:
total 36bp, made of
two long flat
bottom LHC cycles, one nominal optics and the other one low gamma transition
MD title: Transverse damper set up (1 batch
only)
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_Q20_2011_V1
(18bp)
PSB user = LHC_SU_A + LHC_SU_B
PS cycle = LHC_DB_50
PS timing user = ?
SPS user = LHCFAST3
RF MMI target = LHCMD3
Contact People: W. Höfle, D.
Valuch, BE/OP
Additional remarks:
MD title:
Advanced RF setting & emittance blow up (1 batch only)
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_2011_V1
(18bp)
PSB user = LHC_MD_A + LHC_MD_B
PS cycle = LHC_DB_50
PS timing user = LHC_MD
SPS user = LHCMD1
RF MMI target = LHCMD1
Contact People: T. Bohl, J. Tuckmantel, BE/OP
Additional remarks:
Monday 21h00 - Tuesday 00h00
Supercycle:
total 36bp, made of
two long flat
bottom LHC cycles, one nominal optics and the other one low gamma transition
MD title: Advanced RF setting & emittance
blow up (1 batch only)
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_Q20_2011_V1
(18bp)
PSB user = LHC_SU_A + LHC_SU_B
PS cycle = LHC_DB_50
PS timing user = ?
SPS user = LHCFAST3
RF MMI target = LHCMD3
Contact People: T. Bohl, J. Tuckmantel, BE/OP
Additional remarks:
MD title: Set
up of beam in the transverse plane (1 batch only)
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_2011_V1
(18bp)
PSB user = LHC_MD_A + LHC_MD_B
PS cycle = LHC_DB_50
PS timing user = LHC_MD
SPS user = LHCMD1
RF MMI target = LHCMD1
Contact People: H. Bartosik, Y. Papaphilippou, B.
Salvant, BE/OP
Additional remarks:
Tuesday 00h00 - 05h00
Supercycle:
total 36bp, made of
two long flat
bottom LHC cycles, one nominal optics and the other one low gamma transition
MD title: Multi-bunch operation up to high
intensity
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_Q20_2011_V1
(18bp)
PSB user = LHC_SU_A + LHC_SU_B
PS cycle = LHC_DB_50
PS timing user = ?
SPS user = LHCFAST3
RF MMI target = LHCMD3
Contact People: SPSU team, BE/RF, BE/OP
Additional remarks:
MD title:
Multi-bunch operation up to high intensity and direct comparison with Q20
Beam conditions:
50ns beam with double batch PSB-PS transfer
Cycle:
LHCMD_50ns_D_2011_V1
(18bp)
PSB user = LHC_MD_A + LHC_MD_B
PS cycle = LHC_DB_50
PS timing user = LHC_MD
SPS user = LHCMD1
RF MMI target = LHCMD1
Contact People: SPSU team, BE/RF, BE/OP
Additional remarks:
Tuesday 05h00 - Thursday 08h00
Cool down + INJECTOR TECHNICAL STOP
Thursday 08h00 - Friday 08h00
Dedicated physics run:
UA9
Beam conditions:
nominal single LHC-type bunch
Cycle:
MD_26_120_18000_2009_V1
(15bp)
PSB user = LHCINDIV
PS cycle = LHCINDIV
PS timing user = LHCINDIV
SPS user =
LHCMD1 (pulsed), COAST1 (coast)
RF MMI target = MD1
Contact Person: W. Scandale
Additional remarks: