Week 22 - Parallel MD
Monday 30/5/2011 to Wednesday 1/6/2011, between
08h00 and 18h00 compatibly with physics
and LHC
SPS MDs Monday 30/05 - Tuesday 31/05
MD title:
Dependence of fBCT on bunch length and position
Contact People: D. Belohrad, L Soby Additional remarks: 10 acquisitions (averaging) per position = 400ms and that at ~ 10 different position -20mm to +20mm in 5mm steps. Measurements to be done also with different bunch lengths.
Wednesday 01/06 → weekend
MD title:
Comparative wire scanner measurements across machines
Contact People: BE/BI, BE/OP, BE/ABP Additional remarks: both individual (by ring with different settings) and synchronized (over PSB/PS/SPS) measurements are needed for qualification and cross-calibration. This MD basically extends to all injector synchrotrons.
|
PS MDs Monday 30/05 to Wednesday 01/06
MD title:
Injection of 8 x PSB bunches into h=9 (joint with PSB)
Contact People: H. Damerau, S. Hancock Additional remarks:
MD title:
Electron cloud measurements at flat top and with flat
bunches
Contact People: C. Bhat, H. Damerau, S. Hancock, E. Mahner Additional remarks:
MD title:
Working point optimization
Contact People: E. Benedetto, G. Métral, S. Gilardoni, BE/OP Additional remarks:
Contact People: G. Métral, S. Gilardoni Additional remarks:
MD title:
Use of PFWs to control tunes and chromaticities
Contact People: G. Métral, S. Gilardoni Additional remarks:
MD title:
Instability measurements at transition crossing with
gamma-jump
Contact People: S. Aumon, P. Freyermuth Additional remarks:
|
PSB MDs Monday 30/05 to Wednesday 01/06
MD title: Optimization of 8 x PSB bunches to fit into PS h=9 (joint with PS)
Contact People: BE/OP Additional remarks:
|
Back to the Injector MD home page
Author: Giovanni
Rumolo BE-ABP-ICE
Last update:
Tuesday, May 31, 2011 07:45:55 PM
Copyright
CERN