Week 24 - Parallel MD
Tuesday 14/6/2011 to Friday 17/6/2011, between
08h00 and 18h00 compatibly with physics and LHC.
During the weeks 22-23-24, in parallel MDs priority will be given to the
comparative wire scanner measurements across machines.
SPS MDs Tuesday 14/06 - Friday 17/06
MD title:
Impedance localization in the SPS
Contact People: N. Biancacci, B. Salvant Additional remarks: intensity scans and turn by turn data with all BPMS needed
MD title:
Comparative wire scanner measurements across machines
Contact People: BE/BI, BE/OP, BE/ABP Additional remarks: both individual (by ring with different settings) and synchronized (over PSB/PS/SPS) measurements are needed for qualification and cross-calibration. This MD basically extends to all injector synchrotrons.
|
PS MDs Tuesday 14/05 to Friday 17/06
MD title:
Instability measurements on 50ns beams (single batch and
double batch)
Contact People: H. Damerau, S. Hancock Additional remarks:
MD title:
Electron cloud measurements at flat top and with flat
bunches
Contact People: C. Bhat, H. Damerau, S. Hancock, E. Mahner Additional remarks:
MD title:
Working point optimization + Control of chromaticity at 2 GeV
+ Use of PFWs to control tunes and chromaticities
Contact People: E. Bendetto, G. Métral, S. Gilardoni, BE/OP Additional remarks:
MD title:
Measurement of MU42 stray field at 2 GeV
Contact People: G. Métral, S. Gilardoni Additional remarks: Postponed because of lack of instrumentation (to be re-discussed after Technical Stop or towards the end of the run)
MD title:
Space charge and head-tail instabilities at 2 GeV
Contact People: G. Métral, S. Gilardoni Additional remarks:
|
PSB MDs Tuesday 14/05 to Friday 17/06
MD title:
Set up of Ring 1 as spare ring in case of panne of Ring 2,
3 or 4 for 50ns beams
Contact People: BE/OP Additional remarks:
|
Back to the Injector MD home page
Author: Giovanni
Rumolo BE-ABP-ICE
Last update:
Tuesday, May 31, 2011 07:46:19 PM