Week 26 - Parallel MD
Monday 27/6/2011 to Friday 1/7/2011, between
08h00 and 18h00 compatibly with physics, SPS floating MD and LHC
SPS MDs Monday 27/06 - Tuesday 28/06
MD title:
Check of high intensity single bunch
Contact People: H. Bartosik, T. Bohl, B. Salvant, BE/OP Additional remarks: longitudinal parameters all along the ramp and at flat top to be checked prior to injection to LHC
Wednesday 29/06 - Friday 01/07
MD title:
Support to LHC MDs
Contact People: BE/OP, BE/RF Additional remarks:
|
PS MDs Monday 27/06 to Friday 01/07
MD title:
Working point optimization + Control of chromaticity at 2 GeV
+ Use of PFWs to control tunes and chromaticities
Contact People: E. Benedetto, G. Métral, S. Gilardoni, BE/OP Additional remarks:
MD title:
Measurement of MU42 stray field at 2 GeV
Contact People: G. Métral, S. Gilardoni Additional remarks: Postponed because of lack of instrumentation (to be re-discussed after Technical Stop or towards the end of the run)
MD title:
Space charge and head-tail instabilities at 2 GeV
Contact People: S. Aumon, G. Métral, S. Gilardoni Additional remarks:
|
PSB MDs Monday 27/06 to Friday 01/07
MD title:
Emittance vs. intensity measurements in preparation of the
MD on high intensity from Linac2
Contact People: A. Findlay, B. Mikulec, G. Rumolo Additional remarks:
|
Back to the Injector MD home page
Author: Giovanni
Rumolo BE-ABP-ICE
Last update:
Monday, June 27, 2011 12:35:23 PM