Week 13 - Parallel MD
Monday 26/3/2012 to Friday 30/3/2012, between 08h00 and 18h00 compatibly with physics and LHC

SPS MDs

Monday 19/03 - Friday 23/03

MD title: Scrubbing run (electron cloud studies)
Beam conditions: Mainly 25ns beam (nominal and high intensity)

Planning & timelines
Detailed schedule (sheet 1)
Measurements & set up tasks (sheet 3)

Contact People: H. Bartosik, G. Iadarola

Additional remarks:

 

PS MDs

Monday 19/03 to Friday 23/03

MD title: Measurement of the resonance driving terms
Beam conditions: LHCINDIV-type beam at nominal intensity


PSB user = Clone of LHCINDIV for PS MDs mapped on an MD cycle
PS timing user =
PS cycle = 

Contact People: F. Schmidt, R. Wasef

Additional remarks: The magnetic cycle has to be prepared in the PS → 1bp with flat bottom at 1.4 GeV and acceleration to 4 GeV
Turn-by-turn data need to be stored from all BPMs
Chromaticity should be corrected

 

MD title: Preparation of the cycles for the space charge studies
Beam conditions: Re-bucketed beam from PSB on a flat 1.4 cycle or with acceleration to 2 GeV


PSB user =
PS timing user =
PS cycle =

Contact People: BE/OP

Additional remarks:

 

PSB MDs

Monday 19/03 to Friday 23/03

MD title: Emittances and trajectories with varying Linac2 settings
Beam conditions: LHC 25ns high intensity (3 turns injected) and ISOLDE beam (13 turns injected), only Ring 3


PSB user = LHC25_DB_highint on MD1

Contact People: G. Bellodi, D. Kuechler, R. Scrivens, B. Mikulec, G. Rumolo, R. Wegner

Additional remarks: Detailed plan of measurements to be found here


MD title:
Test of the new Finemet cavities in Ring 4
Beam conditions: only Ring 4


PSB user = Finemet_Test to be mapped on a free MD user

Contact People: M. Paoluzzi

Additional remarks:


Back to the Injector MD home page

Back to the Parallel MD page


Author: Giovanni Rumolo BE-ABP-ICE
Last update: Friday, March 23, 2012 04:45:35 PM