Week 24 - Parallel MD
Monday 11/6/2012 to Friday 15/6/2012, between
08h00 and 18h00 compatibly with physics and LHC
SPS MDs Monday 11/06, 08h00 - 14h00
MD title: Preparation of extraction from
the Q20 optics
PSB user = LHCPROBE/LHCINDIV Contact People: H. Bartosik, Y. Papaphilippou, G. Vanbavinckhove Additional remarks: takes place when LHC is not having beam, beam sent down to the TEDs. Allocation of this MD requires then compensation due to the length of the cycle that it requires Monday 11/06, 14h00 - 18h00
MD title: Setting up of the MOPOS system
for impedance
localization and driving terms
measurements
PSB user = LHCINDIV or LHCINDIV_high_int_SPS_PSB Contact People: N. Biancacci, B. Salvant, C. Boccard, H. Bartosik Additional remarks:
Tuesday 12/06
MD title:
Driving term measurements
PSB user = LHCINDIC Contact People: H. Bartosik, F. Schmidt Additional remarks:
MD title: Multi-turn multi-BPM data acquisition
for impedance
localization
PSB user = LHCINDIV or LHCINDIV_high_int_SPS_PSB Contact People: N. Biancacci, B. Salvant, C. Boccard Additional remarks:
Wednesday 13/06
MD title:
Cross calibration of the
WS in the different
injectors
PSB user = LHC_A Contact People: A. Guerrero, G. Sterbini, et al. Additional remarks:
Thursday 14/06 - Friday 15/06
MD title: PS-SPS transmission studies
PSB user = LHC_A + LHC_B Contact People: H. Damerau, H. Timko Additional remarks: The 40 MHz spare cavity in the PS can now be used for this study
Any time when conditions are met and scheduled MD users agree
MD title: Preparation of extraction from
the Q20 optics
PSB user = LHCPROBE/LHCINDIV Contact People: H. Bartosik, Y. Papaphilippou, G. Vanbavinckhove Additional remarks: takes place when LHC is not having beam, beam sent down to the TEDs. Allocation of this MD requires then compensation due to the length of the cycle that it requires
|
||||||||||||||||||||||||
PS MDs MDus1
MD title: COD and resonance crossing with
high intensity beams
Contact People: G. Franchetti (GSI), S. Gilardoni, A. Huschauer, R. Wasef Additional remarks:
MDus2
MD title:
Longitudinal broadband
impedance measurements
Contact People: H. Damerau, S. Hancock, M. Migliorati, G. Rumolo Additional remarks:
MDus3
MD title:
Electron cloud + transverse instabilities @ flat
top
Contact People: M. Pivi, G. Iadarola Additional remarks:
MDus4
MD title:
Tune diagram measurements
Contact People: A. Huschauer, BE/OP Additional remarks: Measurements can be done or continued at night time, when possible
MDus5
MD title: Measurement of the resonance
driving terms
Contact People: R. Wasef, F. Schmidt Additional remarks:
MDus6
MD title:
Dependence of BCT reading
on beam position in TT2
Contact People: F. Lenardon Additional remarks: Steering of the beam in the TT2 will be needed
MDusx is the MD user
with priority
|
||||||||||||||||||||||||
PSB MDs Monday 11/06 to Friday 15/06
MD title:
Transverse
instabilities in the PSB cycle
Contact People: V. Kornilov (GSI), S. Aumon Additional remarks: |
Back to the Injector MD home page
Author: Giovanni
Rumolo BE-ABP-ICE
Last update:
Monday, June 11, 2012 05:17:11 PM
Copyright
CERN