Week 42 - Parallel MD - SPS
Ar-ions setup
T. Bohl, D. Manglunki
Thursday 2014-10-16
The SFTION1 cycle
was put into operation shortly after 08:00. The RF low
level was ready to
take beam a few minutes later and ion beam was
requested. At about 18:45 the
bunch was seen in TT10 and the injection
kicker delay was adjusted. The beam
was still seen on BTV.1029 when the
power cut at 19:03 stopped all beams.
There was no beam available for RF
setting-up.
Friday 2014-10-17
There was no ion beam
available for the SPS during the allocated MD
time.