Week 45 - Parallel MD - PSB

Transverse BTF

 A. Blas

The aim of the MDs was to carry out transverse BTF at 160 MeV and 1.4 GeV (Ring 2 for practical reasons), to check the good functioning of the damper.

The result is that with the actual settings, there is around 30 ns error in the TFB loop (90 deg at 10 MHz)

I spent time re-measuring the different delays within the loop and can’t understand where the error comes from.

I need to make a deeper analysis before cutting cables…