Week 37 - SPS Dedicated MD

Tuesday 11/09 (08:00 - 14:00) - Setting-up of the LHC beam in the SPS (both transverse and longitudinal)

Change of supercycle => LHCMD25.92-55-270_PDOT_V2 (31.2 s long)

Timing sequence Name => LHC25NS-w/coast-0/1/3

Other equipment modifications for the MD:
- Changed accelerator mode for FT: no extraction 
- NORTH extraction off
- MST/MSE girders retracted
- Servo off
- Switched off TT20 AUXPS

Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS => See below how to do this)

RF MMI pointing to LHC25NS (method):

            - Working Sets

            - RF-MMI => SPS-MMI

            - Select context => SPS.USER.LHC25NS

            - View => Show devices description

- MMI target LHC25NS => Enabled and MMI target "previous one" => Disabled. To be done 2 times as it appears 2 times in the list

- Delay has to be set to 550

#injections = 1 with 12 bunches first up to 4 with 72 bunches - Extraction from the PS w/o QKE58

Nb = 1.3 x 1011 p/b

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.35 eV.s

            => Check also that with the timing SIX.MC-CTM Enabled (CCV 425) in Timing New, the instrumentation is working!

            => Copy the RF timings of LHC25NS on COASTPRE and COASTREC (i.e. both RF-SPEC and RF-MMI) using archives.

                For the COAST, we dont't touch (it is adjusted by the experts once). However, there is some fine tuning to be done in particular for the transverse damper

            => Some archives have been done for the COASTPRE, COAST and COASTREC ("settings for coast with SC LHCMD25.92-55-270_PDOT_V2")

            - RF MMI / RF synchro / LHC25NS / Write / BU bunch 3847 for the 1st injection => Put 4247 (i.e. + 400) for the 2nd, 4647 for the 3rd and 5047 for the 4th one.

Participants: OP, RF, ABP, BI

 

Tuesday 11/09 (14:00 - 15:00) - Access to install a matching monitor camera in BA5 (Steve Hutchins)

 

Tuesday 11/09 (15:00 – 19:00) Matching monitors

Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS)

#injections = 1 (12 bunches) - Extraction from the PS w/o QKE58

Nb = 1.3 x 1011 p/b

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.3 eV.s

Put the monitor: STEP / BTV51998M (without beam) and then put the beam ON.

Dump after 3 ms (it is the minimum time we can put)

Contact person: E. Benedetto

 

Tuesday 11/09 (19:00 - 20:00) - Access to remove the matching monitor camera in BA5 (Steve Hutchins)

 

Tuesday 11/09 (20:00 - 22:00) SPS-LHC re-phasing on the flat-top at 270 GeV/c

Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS)

#injections = 1-4 (12 and/or 72 bunches) - Extraction from the PS w/o QKE58

Nb = 1.3 x 1011 p/b

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.35 eV.s

Contact person: P. Baudrenghien

 

Tuesday 11/09 (22:00) – Wednesday 12/09 (02:00)Study for the LHC BLMs

Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS)

#injections = 1 (12 bunches) - Extraction from the PS w/o QKE58

Nb = 1.3 x 1011 p/b (can be varied)

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.3 eV.s

Coast at 270 GeV/c

Contact person: B. Holzer

 

Wednesday 12/09 (02:00 - 06:00) - Study of the effect of energy (and transverse beam emittances) on the electron cloud vertical fast instability at 55 GeV/c

Beam conditions: PSB users = LHC25A&B / PS user = LHC25 / SPS user = LHC25NS (RF MMI pointing to LHC25NS)

#injections = 1-4 (72 bunches) - Extraction from the PS w/o QKE58

Nb = 1.3 x 1011 p/b

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.35 eV.s

Contact person: G. Rumolo

  

Wednesday 12/09 (06:00 – 08:00) Scrapers (at 270 GeV/c)

#injections = 1 (12 bunches) - Extraction from the PS w/o QKE58

Nb = 1.3 x 1011 p/b

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.35 eV.s

Coast at 270 GeV/c

Contact person: H. Burkhardt

 


Author: Elias Métral - AB/ABP
Last update: Tuesday, September 11, 2007 11:34:49 PM