Change of supercycle => ION-ACC270-L18000_V1 (18 s long, 15 BPs) => Please try and prepare the supercycle during the preceding shift!
Timing sequence Name => LHCION-1/2/3
Beam conditions: LEIR user = EARLY / PS user = LHCION / SPS user = LHCION (RF MMI pointing to LHCION => See below how to do this)
RF MMI pointing to LHCION (method):
- Working Sets
- RF-MMI => SPS-MMI
- Select context => SPS.USER.LHCION
- View => Show devices description
- MMI target LHCION => Enabled and MMI target "previous one" => Disabled. To be done 2 times as it appears 2 times in the list
- Delay has to be set to 550
- Note that the timing SIX.MC-CTM is Enabled with a CCV of 425 (ms) for the protons, while it is 525 (ms) for the ions as they are extracted from the PS 100 ms later than the protons.
#injections = 1 to 3 with 1 bunch - Extraction from the PS w/o QKE58
Nb = 1.0 x 1010 charges/b
Transverse emittances: e* < 1 mm
Bunch length (4 sigmas): tB = 4 ns.
Longitudinal emittance: eL* < 0.05 eV.s/u
Wednesday 24/10 (08:00 - 12:00) - Setting-up of the cycle and injection, test coast without beam
Participants: ABP, OP
Wednesday 24/10 (12:00 - 24:00) - Acceleration of up to 3 bunches to 270GeV/c
Participants: ABP, OP, RF
Contact Person:
Th. Bohl
Thursday 25/10 (00:00 - 01:00) - Test of coast at 270GeV/c with beam
Participants: ABP, OP, RF
Contact Person:
D. Manglunki
Thursday 25/10 (01:00 - 07:30) - Collimation tests, loss maps with LHC BLMs
(Possible access in SPS machine for LHC BLMs)
Participants: ABP, BI, OP
Contact Person:
J. Jowett
Thursday 25/10 (07:30 - 08:00) - Restoring physics conditions
Participants: OP
Authors: Elias Métral - AB/ABP
and Django Manglunki - AB/OP
Last update:
Wednesday, October 24, 2007 08:57:23 AM
Copyright
CERN