Week 26 - Parallel MD

Monday 25/06  (08:00 - 18:00) - Setting-up of the RF feedback and feedforward with LHC beam in the SPS

Beam conditions: LHC25ns in SPS on Cycle SFT-LHCMD37_L16800_PDOT_V1 (16.8 s long)

#batches = 1 (72 bunches) - LHC25ns in position 9-10-11 in the PS SC - Extraction w/o QKE58

Nb = 1.3 x 1011 p/b

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.35 eV.s

Participants: OP, RF

Contact person: T. Bohl

 

Tuesday 26/06  (08:00 - 18:00) - 800 MHz phasing + Study of the effect of energy (and transverse beam emittances) on the electron cloud vertical fast instability

Beam conditions: LHC25ns in SPS on Cycle SFT-LHCMD37_L16800_PDOT_V1 (16.8 s long)

#batches = 1 (72 bunches) - LHC25ns in position 9-10-11 in the PS SC - Extraction w/o QKE58

Nb = 1.3 x 1011 p/b

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.35 eV.s

Participants: ABP, OP, RF

Contact person: T. Bohl, G. Rumolo

 

 

Thursday 28/06 (08:00 - 18:00) - Study of the effect of energy (and transverse beam emittances) on the electron cloud vertical fast instability

Beam conditions: LHC in SPS on Cycle SFT-LHCMD37_L16800_PDOT_V1 (16.8 s long)

#batches = 1 (72 bunches) - LHC25ns in position 9-10-11 in the PS SC - Extraction w/o QKE58

Nb = 1.3 x 1011 p/b (i.e. nominal intensity)

Transverse emittances (e* < 3 mm)

Longitudinal emittance: eL* = 0.35 eV.s

Participants:ABP, OP, RF

Contact person: G. Rumolo

 

Friday 29/06 (08:00 - 18:00) - PS Setting-up for MTE studies

Beam conditions: MD2 in PS, MD1 in PSB

Participants:ABP, OP

Contact person: S. Gilardoni

 

 


Author: Elias Métral - AB/ABP
Last update: Friday, June 22, 2007 04:36:34 PM
Copyright CERN