From 08:30 to 09:00 there will be some work on the databases (Ronny Billen)
First MD: Start of the PSB studies of the LHC beams in the LINAC4 era (~ 09:00 to 17:00)
Beam conditions: 2 cycles needed (called TSTPS in the PSB)
The MD will be parallel, i.e. beams to ISOLDE and the PS on the remaining cycles will be delivered
Contact Person: K. Hanke
Second MD: Testing a modified MHS with an additional serial input (~ 09:00 to 13:00)
Beam conditions: PS user = TSTLHC25 (and perhaps TSTLHC75) and PSB user = LHC25A (and perhaps LHC75A)
#bunches =12 - 48 (4 to 16 bunches)
No special requirements on intensity
Comment: This MD affects all LHC multi-bunch beams and AD. However, AD might
still be deliverable during this part of the MD
Contact Person: H. Damerau
Third MD: Test of a possible transition crossing phase feed-forward on the MHS system (~ 13:00 to 17:00)
Beam conditions: PS user = TSTLHC25 and PSB user = LHC25A
#bunches =12 - 48
Contact Person: H. Damerau
Author: Elias Métral - AB/ABP