Week 37 - Injector Long MD (the SPS part has been cancelled => Only PSB and PS) Monday 08/09 (08:30 - 17:00)

 

From 08:30 to 09:00 there will be some work on the databases (Ronny Billen)

 

First MD: Start of the PSB studies of the LHC beams in the LINAC4 era (~ 09:00 to 17:00)

Beam conditions: 2 cycles needed (called TSTPS in the PSB)

The MD will be parallel, i.e. beams to ISOLDE and the PS on the remaining cycles will be delivered

Contact Person: K. Hanke

 

Second MD: Testing a modified MHS with an additional serial input (~ 09:00 to 13:00)

Beam conditions: PS user = TSTLHC25 (and perhaps TSTLHC75) and PSB user = LHC25A (and perhaps LHC75A)

#bunches =12 - 48 (4 to 16 bunches)
No special requirements on intensity
Comment: This MD affects all LHC multi-bunch beams and AD. However, AD might still be deliverable during this part of the MD

Contact Person: H. Damerau

 

Third MD: Test of a possible transition crossing phase feed-forward on the MHS system (~ 13:00 to 17:00)

Beam conditions: PS user = TSTLHC25 and PSB user = LHC25A

#bunches =12 - 48
No special requirements on intensity
Comment:  This MD affects all LHC multi-bunch beams and AD. It will most probably not be possible to deliver AD beam during that part of the MD

Contact Person: H. Damerau
 


Author: Elias Métral - AB/ABP
Last update: Friday, September 05, 2008 03:23:15 PM
Copyright CERN