Week 28 - Parallel MD

1) Reminder: During the days (08:00 to 18:00) the SPS supercycle is SFTLong-3CNGS-LHCFAST-MD (length = 40 BP = 48 s), while during nights and week-ends it is SFTLong-3CNGS (length = 28 BP = 33.6 s).

2) There should always be 1 cycle reserved for parallel studies in the PSB.

3) During the week (when possible) the PS will continue to work on the matrix measurements with the 5-CM PFWs (on MDPS or TSTPS, i.e. 2 BP cycle, R. Steerenberg).

 

Monday 07/07 (08:00) to Thursday 10/07 (08:00)

Injector Long MD

 

Thursday 10/07 and Friday 11/07 (08:00 - 18:00) - RF studies on the compatibility between high-intensity and low-intensity LHC beams in the PS

Beam conditions: LHCPILOT and LHC25 nominal in the same PS supercycle

Contact person: M. Morvillo

 


Author: Elias Métral - AB/ABP
Last update: Monday, June 30, 2008 05:25:38 PM