Week 31 - Parallel MD
Reminder 1: There should always be 1 cycle reserved for parallel studies in the PSB => Check during the week the LHC beam with 75 ns bunch spacing in the PSB to be ready for the Injector Long MD of week 33. This beam will be taken by the PS in week 32.
Reminder 2: During the week (when possible) the PS will continue to work on the Matrix measurements with the 5-CM PFWs.
Monday 28/07 (08:00 - 18:00) - Rephasing of the LHC beam at flat top in the SPS
Beam conditions: SPS user = LHCFAST1 (supercycle = SFT_LONG-3CNGS-LHCFAST-MD37_V1), PS user = TSTLHC25 and PSB user = MD2
#bunches = 12
Nb = 1.3 x 1011 p/b (the intensity could be decreased by a factor 5, if needed, by putting the sieve. In this case inform Heiko to adjust the PS)
Transverse emittances: e* £ 3 mm
Longitudinal emittance: eL* = 0.35 eV.s
Contact Person: P. Baudrenghien
Tuesday 29/07 (08:00 - 18:00) - Rephasing of the LHC beam at flat top in the SPS
Beam conditions: SPS user = LHCFAST1 (supercycle = SFT_LONG-3CNGS-LHCFAST-MD37_V1), PS user = TSTLHC25 and PSB user = MD2
#bunches = 12
Nb = 1.3 x 1011 p/b (the intensity could be decreased by a factor 5, if needed, by putting the sieve. In this case inform Heiko to adjust the PS)
Transverse emittances: e* £ 3 mm
Longitudinal emittance: eL* = 0.35 eV.s
Contact Person: P. Baudrenghien
Wednesday 30/07 (08:00 - 18:00) - Test of the LHC beta-beating application in the SPS + Test of the intensity based interlock flags for LHC injection
Beam conditions: SPS user = LHCFAST1 (supercycle = SFT_LONG-3CNGS-LHCFAST-MD37_V1), PS user = LHC25 and PSB user = LHC25A
#bunches = 12 (1 PSB ring)
Low intensity per bunch (~ 1E10 p/b) => PSB: use the sieve or the relative archive (LHCA+B 1/10 of nominal intensity)
Contact People: R. Tomas and J. Wenninger
If possible: Tests for the beam to be used for the SPS longitudinal impedance measurements between PSB and PS (PSB user = MD3, PS user = MD4).
Contact people: J. Tan and H. Damerau
Thursday 31/07 (08:00 - 18:00) - h8/h16 PS extractions with CT
Contact person: S. Gilardoni and SPS RF experts. This MD will use one of the nominal CNGS cycles of the supercycle.
Following request from J. Wenninger (24/07/2008)
- Preparation to the LHC injection test (09-10/08/2008).
Beam required: LHCPROBE and/or LHCPILOT on the LHCFAST1. No conflict with the above scheduled MD, if it takes place.
Contact Person: J. Wenninger
Maybe add setting up of the LHC beam with 50 ns bunch spacing in the PS ?
Friday 01/08 (08:00 - 18:00) - Setting-up of the LHC beam with 50 ns bunch spacing in the PS
Contact person: S. Hancock
Author: Elias Métral - AB/ABP
Last update:
Friday, July 25, 2008 05:54:35 PM