Week 34 - Parallel MD
Reminder 1: There should always be 1 cycle reserved for parallel studies in the PSB.
Reminder 2: During the week (when possible) the PS will continue to work on the Matrix measurements with the 5-CM PFWs.
Monday 18/08 (08:00 - 14:00) - Rephasing of the LHC beam at flat top in the SPS
Beam conditions: SPS user = LHCFAST1 (supercycle = SFT_LONG-3CNGS-LHCFAST-MD37_V1), PS user = TSTLHC25 and PSB user = LHC25A
#bunches = 12
Nb » 0.6 x 1011 p/b
Transverse emittances: e* £ 3 mm
Longitudinal emittance: eL* = 0.35 eV.s
Contact Person: P. Baudrenghien
Monday 18/08 (14:00) to Friday 22/08 (08:00 - 18:00) - Prepare, in the SPS, the beams which will be used for the LHC injection tests of week-end 23-24/08/08
Beam conditions: SPS user = LHCFAST1 (supercycle = SFT_LONG-3CNGS-LHCFAST-MD37_V1)
Beams which will/could be used:
1) LHCPROBE with the new definition (following the first LHC injection tests of week-end 09-10/08/08): 2E9 p/b (instead of 5E9 p/b)
2) LHCPROBE with the new definition (2E9 p/b) composed of 2 bunches spaced by 525 ns (as for TOTEM)
3) LHCPILOT
=> Check in the injector chain the switching between the 3 beams. Discussions ongoing to see whether we reduce the intensity (on LHCPROBE) in the PSB, the PS or the SPS.
Author: Elias Métral - AB/ABP
Last update:
Monday, August 18, 2008 09:53:04 AM
Copyright
CERN