- LHC_4Inj_FB10860_FT500_2009_V1.csv => LHC 4 batches 3600 ms / batch (18 BP = 21.6 s).
- CBCM: CBCMInCatalog, Viewer, PulseStart, LHC1, PulseStop.
- CBCM timings and RF MMI Targets:
- LHC1 (= SPS user Timing): Picture 1, 2, 3, 4, 5 (RF MMI target = LHC25NS) and 6.
- Modifications required for the MD:
- Change accelerator mode for FT: no extraction.
- NORTH extraction off.
- MST/MSE girders retracted.
- Servo off.
- Switched off TT20 AUXPS.
- Procedure with LHC beams: - The interlock threshold on the temperature of the MKE kickers should be ~
90º C (it should be ~ 70º C when there are
extractions) => No need to call Etienne Carlier anymore as it is done in SIS. - During (the scrubbing run and) the LONG MDs with LHC beam the
ZS are RETRACTED / HV to 0 kV (Mask NORTH_ZS_HV_OFF in SIS) / ION TRAPS ON (inform the ZS expert). The cooling
circuit for the septa magnets (circuits 214, 414 and 614) should be switched OFF
(by TI from the CCC). Block the fast vacuu
BA 1 : VVFA 11901
BA 2 : VVFA 21701, VVFB 21877, VVFB 21802
BA 4 : VVFA 41638
BA 6 / TT 60 : VVFA 610213, VVFA 61957, VVFA 61637, VVFA 61460, VVFB 61802, VVFB 61877
- The magnets with the e-cloud monitors are 4 dipoles: MDHW51832, 51836, 51838, 51853, all with 0.12 T (MDHW51832 with 25 A). In addition, there is a C-magnet (MDPH51753 with 28.5 A, in series with 754 to compensate) which contains a sample which can be inserted and removed. They should be masked in the SIS when they are ON.
Author: Elias Métral - AB/ABP
Last update:
Tuesday, November 03, 2009 09:32:47 AM
Copyright
CERN