Week 43 - Parallel MD

 

Reminder 1: There should always be 1 cycle reserved for parallel studies in the PSB and PS.

Reminder 2: Continue the detailed campaign of measurements of transverse beam profiles in the SPS with all the BWS available (416, 519, 521 and 414V).

 

Monday 19/10 (08:00 - 18:00)

PS(&SPS) ion commissioning (setting-up in // of the early ion beam)

Beam conditions: SPS cycle = SFTLONG1 + 4 CNGS1 + LHCION1, PS user = LHCION (MDION is reserved for the nominal beam) and LEIR user = EARLY

SPS user Timing = LHCION1 (LHCION2 is reserved for the dedicated MD)

Contact Person: D. Manglunki

Instability studies at PS transition (if available cycle, as ions have priority)

Beam conditions: PS user = MD3 and PSB user = TSTPS (ring 2)

Contact Person: S. Aumon

Tuesday 20/10 (08:00 - 16:00)

SPS (or PS) dedicated MD

 

Wednesday 21/10 (08:00 - 12:00) and Thursday 22/10 (08:00 - 12:00) - Validation tests of YASP on high energy orbit corrections in PS with beam

Beam conditions: PS user = 2 BP LHC-type cycle (such as TSTPS)

Contact Person: M. Gourber-Pace

 

Friday 23/10 (08:00 - 18:00)

Check beams which will be required for the LHC Injection Test during the week-end

Contact Person: OP

Instability studies at PS transition

Beam conditions: PS user = MD3 and PSB user = TSTPS (ring 2)

Contact Person: S. Aumon



Author: Elias Métral - AB/ABP
Last update: Monday, October 19, 2009 10:44:54 AM
Copyright CERN