Week 42 - Long Injector MD 

(From Tuesday 19/10 at 08:00 to Friday 22/10 at 18:00, last part could be in // to LHC)


LHC stops from Tuesday morning until Friday afternoon

- Tuesday 08:00 - Wednesday 07:00  =>  SPS upgrade studies

Beam conditions: LHC-type beams with 50ns (LHC_4Inj_FB7260_FT_835_2010_V1.csv, 15bp) and 25ns spacing (LHC_4Inj_FB10860_FT835_2010_V1.csv, 18bp)

First part of the MD:

- PSB user = LHC50

- PS user = LHC50

- SPS user = LHC4

- RF MMI target = LHC25NS

- Timing sequence in the CBCM = LHC1-0/1/2(1)

Second part of the MD:

- PSB user = LHC25A+B

- PS user = LHC25

- SPS user = LHC1

- RF MMI target = LHC25NS

- Timing sequence in the CBCM = LHC1-0/1/3(1)

Contact people: E. Shaposhnikova, T. Bohl, SPS Upgrade WG 

 

- Wednesday 07:00 - Wednesday 08:00  =>  Supercycle change to LHC_ION_15inj_FT2306_450_2010_V1 (for 15 ion injections, 36 bp)

Contact people: BE/OP, BE/RF

 

- Wednesday 08:00 - Wednesday 18:00 => Tests with the 15 injection I-LHC cycle

Beam conditions: 11 ion bunches will be injected into the SPS, because of a hardware limitation to 24 cycles per beam in the central timing

- LEIR user = EARLY

- PS user = LHCION

- SPS user = LHCION

- RF MMI target = LHCION2

Contact people: T. Bohl, P. Baudrenghien, D. Manglunki

 

- Wednesday 18:00 - Wednesday 19:00  =>  Supercycle change to MD_26_120_18000_2009_V1.csv  (coastable at 120 GeV/c, 15 bp, some references can be found at https://ab-mgt-md-users.web.cern.ch/ab-mgt-md-users/2009/MDCycles/SomeReferencesForpCoastAt120GeV/Ref.htm).

Contact people: S. Cettour-Cave, BE/OP, BE/RF

Beam conditions: 12 bunches of LHC 25ns beam at half intensity (5e10 ppb)

- PSB user = LHC25A (only Ring 3, half intensity archive)

- PS user = LHC25

- SPS user = LHCMD1

- RF MMI target = LHC25NS

- Timing sequence = LHCMD2 0/1/3

For the coast, mask the following SIS interlocks: KICKERS_SPSRING (essentially for the MKD_EARLY_ENABLED), switch off the MDSH119 (otherwise it will trip), POWER_CONVERTERS_TT10 (as some could trip during the coast) and BLRING_DUMP_CHANNEL_VETO.

 

- Wednesday 19:00 - Wednesday 23:30  =>  SPS studies in view of an installation of a KEK-B crab cavity in the SPS (emittance growth over coasts). Same beam condition, cycle and users as above.

Contact people: O. Dominguez, L. Ficcadenti, R. Tomás,  J. Tuckmantel, F. Zimmermann

 

- Wednesday 23:30 - Thursday 00:00  =>  Change to the supercycle coastable at either 55 or 270 GeV/c. The cycle name is MD_25.92_55_270_2009_V1, 26 bp

Contact people: BE/OP

Beam conditions: 12 bunches of LHC 25ns beam at half intensity (5e10 ppb)

- PSB user = LHC25A (only Ring 3, half intensity archive)

- PS user = LHC25

- SPS user = LHCMD2

- RF MMI target = LHC25NS

- Timing sequence = LHCMD2 0/1/3

 

- Thursday 00:00 - Thursday 05:00  =>  BBLR studies. Same beam condition, cycle and users as above

Contact people: O. Dominguez, J-P. Koutchouk, G. Sterbini, F. Zimmermann

 

- Thursday 05:00 - Thursday 08:00  =>  Cool-down

Contact people: BE/OP

 

- Thursday 08:00 - Thursday 20:00  =>  Technical stop

 

- Thursday 20:00 - Thursday 21:00  => Start-up after TS with supercycle MD_26_120_L18000_2009_V1.csv  (coastable at 120 GeV/c, 15 bp)

Contact people: BE/OP, BE/RF

 

- Thursday 21:00 - Friday 17:00  => UA9

Contact person: W. Scandale + UA9 collaboration

 

Linac2:

- Wednesday 10:00 - Wednesday 11:00 - Test of the new Linac2 SISWatchdog

Contact person: R. Scrivens

 

PS:

- Friday 09:00 - Friday 17:00 - Validation of coherent injection oscillations measurement + correction of the 2nd batch with YASP

Beam conditions and cycleLHC25 beam with double batch injection

PSB user =  LHC25A+B

PS user = LHC25

Contact person: M. Gourber-Pace

 

- Friday 17:00 - Friday 18:00  =>  Recovery from MD, switch back to physics

- Change of supercycle

- Send beam to physics at the earliest time after set up of the physics beams

Contact people: BE/OP

 


Author: Giovanni Rumolo - BE/ABP
Last update: Tuesday, October 20, 2010 12:00:22 AM
Copyright CERN