Week 25 - Injector MD (Thursday 24/06/2010) => This MD should have been done during a LHC cryo stop which will finally not take place (Email from Mike Lamont, 20/06/10) => Still discussions to perform it on Tuesday during a LHC stop (shorter than 24 h*) or on Thursday during (hopefully) a physics fill

- 08:00 - 12:00 => PS B field fluctuation studies in // (Rende)

- 12:00 - 20:00 => PS B field fluctuation studies in dedicated (Rende)

* This means that the 24 h required to install an ecloud monitor in SS in the SPS (to be ready for the MDs in week 29) will not be available.

 


Author: Elias Métral - AB/ABP
Last update: Sunday, June 20, 2010 11:21:49 PM