Week 23 - Parallel MD (starting on Monday 07/06/2010 and ending on 11/06/2010)

Monday 07/06 (08:00) to Friday 11/06 (18:00) - Preparation of the 150 ns bunch spacing beam (with 12 bunches) in the PS => What is the maximum achievable intensity/bunch? (to be ready for LHC in July/August)

Beam conditions:

- User in the PSB = LHC75 and user in the PS = LHC75.

- 3 PSB rings with 2 bunches, 1-batch mode, 0.6 eVs (instead of the nominal 0.9 eVs).

Contact PersonsS. Hancock

 

Author: Elias Métral - AB/ABP
Last update: Tuesday, May 25, 2010 10:14:28 PM
Copyright CERN