Week 31 - Parallel MD (Monday through Friday 2-6/08/2010, from 8h00 to 18h00)

N.B. The parallel MDs take place all the time from 8:00 to 18:00, provided the LHC is in store or does not request beam. The MD cycle is removed from the supercycle during the LHC filling

Monday-Tuesday - Study of the maximum intensity 150ns beam that can be injected and accelerated in the SPS with acceptable beam quality under PS standard hardware conditions

Beam conditions 150ns beam with intensity up to nominal (1.1e11 ppb), single batch injection into the SPS (12 bunches)

PSB user = LHC75

PS user = LHC75

SPS user = LHCFAST3

MMI Target = LHCMD

Contact PersonA. Findlay, S. Hancock, T. Bohl, E. Métral, K. Cornelis

Wednesday-Friday - Single-bunch (TMCI + longitudinal) studies in the SPS with higher intensities than nominal (with the new beam prepared in the PSB-PS the weeks before: ~ 3E11 p/b were reached!)

Pre-requisites:

Due to high peak signal, the MOPOS have to be disconnected before injecting this beam into the SPS

Beam conditions PSB user = MD3, PS user = MDPS, SPS user = MD1 (MD_26_L7200_V1)

Contact PersonW. Hofle, E. Shaposhnikova and E. Metral / B. Salvant

 


 

Author: Giovanni Rumolo BE/ABP-ICE