2011 LHC Injector Machine Development Planning

Injector MD Coordinator:

Giovanni Rumolo (BE-ABP-ICE)

Deputy: Yannis Papaphilippou (BE-ABP-LIS)

Injector Schedule and MD Documents

Current Injector Schedule
Current LHC Schedule
Injector Schedule History
MD Planning 2011
 
Coupling between the different machines (to be entered in the CBCM)
Further explanations of coupling between the machines
SPS RF MMI Mapping

Injector Machine Development Steering Links

LHC Beam Operation Committee
LIU Day (Thoiry, Dec 1st 2010)
SPS Upgrade Study Team
PSB Upgrade Working Group
LHC MD web page
Strategy talk 2010 by E. Metral (August 6th 2010)
Status and Prospects for the 150ns Beam Injectors

General Info and Current News:

1) Parallel MDs in all machines take place every week day during the working hours (8:00 - 18:00)
2) Floating MDs take place in parallel with the LHC operation, and therefore they are stopped when
the LHC needs to inject. No physics is guaranteed during the MD time, but beam will be provided to
the PSB/PS physics users on a best effort basis.
3) The beam requirements for the 3rd LHC MDs (24-28 August) can be downloaded here.