Week 33 - Parallel MD
Monday 11/08/2014 to Friday 15/08/2014, between 08h00 and 18h00 compatibly with physics and LHC

No SPS MDs

 

PS MDs

MDus1

MD title: Resonance identification after re-alignment
Beam conditions: beam with large emittance


PSB user = XL_T_EMITT_2014
PS user = LIU_V1_Tune_Al

Contact People: A. Huschauer

Additional remarks:

 

MDus2

MD title: Beta beating and resonance driving terms
Beam conditions: low intensity beam, single LHC bunch


PSB user = LHCINDIV_2014
PS user = LHC_INDIV

Contact People: R. Wasef

Additional remarks:

 

MDus3

MD title: Beam-based verification of calibration curves of WS
Beam conditions: single LHC bunch


PSB user = LHCINDIV_2014
PS user = LHC_INDIV

Contact People: G. Sterbini

Additional remarks:

 

MDus4

MD title: Preparation for tune shift measurements
Beam conditions: single LHC bunch


PSB user = LHCINDIV_2014
PS user = LHC_INDIV

Contact People: N. Biancacci, S. Persichelli

Additional remarks:

 

MDus5

MD title: Fast temperature interlock tests for SMH57
Beam conditions: Supercycle with high loading of EASTA users as in operational conditions (to be checked with Rende)


PSB user = EASTA
PS user = EASTA

Contact People: R. Barlow, J. Borbourgh

Additional remarks: Desired worst case of EAST extractions within a supercycle in order to monitor the fast temperature interlock system which has received an upgrade during LS1. The idea is to run the system for a while in order to determine operational settings to ensure smooth operation during future EAST extractions and projection of interlock occurrence distribution.
N.B. This MD will not alter beam/machine settings, it will only monitor the interlock behavior while the septum to extract beam to the EAST area (SMH57) is pulsing at high rate. The tests will be conducted first without and then with beam in the machine. The beam will be sent to EAST.DUMP.

 

MONDAY
(11/08)
TUESDAY
(12/08)
WEDNESDAY**
(13/08)
THURSDAY
(14/08)
FRIDAY
(15/08)
Morning
8:00 - 14:00

MDus2 MDus5 MDus2 MDus2
Afternoon
14:00 - 20:00

MDus2 Dedicated study in the PSB 14:00-16:00
MDus2
MDus2
MDus2
Night
20:00 - 8:00
         

MDusx is the MD user with priority
MDusx is the MD user in "spare" (i.e. replacing MDusx when not available, or played when second MD cycle available)

** Wednesday is dedicated MD. MD users have priority.

PSB MDs

Monday 11/08 - Friday 15/08

MD title: Resonance compensation for high intensity beam
Beam conditions: ISOLDE type beam


PSB user = MD_Resonance_ISOGPS

Contact People: M. Kowalska

Additional remarks:

 

Back to the Injector MD home page

Back to the Parallel MD page


Author: Giovanni Rumolo BE-ABP-ICE
Last update: Thursday, August 21, 2014 10:31:41 AM
Copyright CERN