2011 LHC Injector Machine Development Planning |
|
SPS Physics and MD CyclesNote: To see an enlarged version of the control settings, click one of the thumbnails listed below. LHCFAST L7200LHCFAST cycle (6BP = 7.2s) to have similar Eddy currents on SFTPR0 as the ones produced by CNGS. The user LHCFAST1 is reserved for the bunch LHCPROBE and the user LHCFAST2 for the LHCINDIV bunch. LHCFAST L7200 2009MD MTE 400MD cycle reserved for MTE (5BP = 6s = same length as a CNGS cycle). MD MTE 400MD 26 L7200MD segment at 26 GeV/c (6BP = 7.2s = same length as a LHCFAST cycle). MD 26 L7200LHC 4Inj FB10860 FT500LHC 4 batches 3600ms / batch (18BP = 21.6s). LHC 4Inj FB10860 FT500LHC 4Inj FB7260 FT500LHC 4 batches 2400ms / batch (15BP = 18s). LHC 4Inj FB7260 FT500 |