2009 MD Planning



 

How to submit a request of machine development time?

 

Send a short summary of your MD to the MD Coordinator

 

Status of the MDs in 2009

 

Coupling between the different machines (to be entered in the CBCM) => More explanations

 

SPS RF MMI mapping

 


 

Long MD sessions

Weeks: 25 - 29 - 33 - 38 - 39 - 41 - 45

 




"Wednesday" MD sessions

Weeks: 27 - 31 - 35 - 43

 


 

Sessions in parallel with physics

Weeks:  21to23 - 24 - 25- 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47

 


 

TI and LHC injection tests

Week-ends: 23 (TI8) - 28 (TI2) - 39 (TI2 & TI8 test, p & ions) - 43 (LHC Injection Test)

 


 

SPS MD cycles

- LHC_4Inj_FB10860_FT500_2009_V1.csv => LHC 4 batches 3600 ms / batch (18 BP = 21.6 s): Some references.

- LHC_4Inj_FB7260_FT500_2009_V1.csv => LHC 4 batches 2400 ms / batch (15 BP = 18 s).

- LHCFAST_2009_V2.csv => LHCFAST cycle (7 BP = 8.4 s).

- LHCFAST_L7200_2009_V1.csv => LHCFAST cycle (6 BP = 7.2 s) to have similar Eddy currents on SFTPR0 as the ones produced by CNGS. Some references.

- MD_25.92_120_L18000_2009_V1.csv => Cycle used for the p+ coasts at 120 GeV/c (15 BP = 18 s): Some references. Setting-up of all the UA9 MDs in 2009. Some MD results for UA9 (ELogBook). In fact this cycle was renamed at some point to MD_26_120_18000_2009_V1 and this is the cycle which was played during the 2009 run.

- MD_26_L6000_2009_V1.csv => MD segment at 26 GeV/c (5 BP = 6 s = same length as a CNGS cycle).

- MD_26_L8400_2009_V1.csv => MD segment at 26 GeV/c (7 BP = 8.4 s = same length as a LHCFAST cycle of 8.4 s).

- MD_55_106_2009_V1.csv => Cycle used for BBLR studies (7 BP = 8.4 s). Some references.

- MD_MTE_400_2009_V1.csv => MD cycle for MTE (5 BP = 6 s = same length as a CNGS cycle). Some references.

- LHC_ION_1inj_FT2000_450_2009_V1.csv => Cycle used for the SPS commissioning of the early ion beam in // (8 BP = 9.6 s) with SPS user timing = LHCION1. Some references.

- LHC_ION_4inj_FT2000_450_2009_V1.csv => Cycle used for the SPS commissioning of the early ion beam in dedicated (14 BP = 16.8 s) with SPS user timing = LHCION2. Some references.

- MD_ION_4inj_FT2000_120_2009_V1.csv => Cycle used for coasts at 120 GeV/c with the early ion beam (12 BP = 14.4 s). Some references.

 


 

MD requirements in terms of cycles

Weeks: 22 - 23 - 24 - 25- 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46

 


Author: Elias Métral - AB/ABP
Last update: Wednesday, April 28, 2010 10:24:17 PM